Jieyao Lighting · Two-head solar lighting systems
A double-arm solar street light describes two lighting positions on one pole. It does not specify the battery arrangement. A proposal can assign separate solar supply systems to the two heads, or use an engineered shared supply with suitable control of both loads. Compare the component schedule and electrical arrangement, then calculate each head's operating duty. Two arms, two panels and two battery enclosures are different facts.
The distinction matters when the two lights serve different areas. A road head might operate through the night while a head facing a closed parking area follows a reduced-output schedule. Their similar appearance does not give them equal energy requirements. The supply design needs to follow those duties.
Separate arm count from supply architecture
Compare separate and shared supplies
Calculate two different nightly duties
Match the collection and storage
Define controls and low-energy behaviour
Plan maintenance and replacements
Prepare a two-head system brief
Double arm describes the pole's mounting arrangement. The heads can face opposite directions or serve two different zones, subject to the chosen arm geometry and lighting layout. The label alone does not establish coverage, pole spacing or a reduction in the number of foundations.
Solar identifies the proposed energy source. The design still needs to state how the modules, battery storage, charge control and luminaires connect. A photograph can show the external arrangement, but enclosed batteries and control equipment need their own component information.

Three light heads beneath a solar-panel assembly — a component-layout example.
The multi-head photograph makes the distinction visible: light heads and the panel support can be counted from outside, while the storage and internal control arrangement require other information. For a two-head enquiry, request the exact two-head assembly drawing and its component schedule.
There are documented separate-supply examples. E-Able Power's published 7 m double-arm split-light page lists two panels, two battery packs, two MPPT controllers and two luminaires. [1] That is a component inventory for its named configuration. A procurement review still needs the connections, settings and supplied scope for the offered system.
Component packaging is another dimension. A battery may sit with a luminaire, a panel assembly or a separate enclosure. Our integrated and split solar street light comparison covers that wider layout choice. Here, the question is how the two lighting duties are supplied.
In this concept, each head has an assigned collection, storage and control arrangement. Its nightly demand is checked against the resources allocated to it. If the two heads have different programmes, their required energy can differ even when the normal input power is identical.
Keep that allocation visible in the bill of materials and electrical documentation. Two identical battery labels do not demonstrate that both duties are met. Equally, excess stored energy assigned to one separate system is not automatically available to the other.
Here, both luminaire loads draw from an engineered common energy supply. The design must support the simultaneous load, the required output channels and the intended controls. Any separate schedules, protection and fault behaviour need to be part of that design.
A shared battery does not mean any controller can run two lights, or that two batteries can be connected together at site. Battery compatibility, controller ratings, wiring and protection belong to the matched system. Select a documented assembly rather than adapting loose components from their labels.
Separate-supply concept: Head A has an assigned energy system; Head B has another assigned energy system.
Shared-supply concept: one engineered energy system serves the combined Head A and Head B duty, with the required load-channel controls.
These descriptions are conceptual. They do not depict the wiring of the photographed installation or the E-Able example.
↔ Swipe to compare the supply boundaries.
| Question | Separate supplies | Shared supply |
|---|---|---|
| What load is assessed? | Each head's programme against its assigned supply. | The combined programme and simultaneous demand, with each head's required service identified. |
| How are different schedules handled? | Document the settings and timing for each head. | Document how the offered channels implement both schedules. |
| Can one head use spare energy assigned to the other? | Not automatically in independent systems. | The common supply must be assessed with its actual control and protection behaviour. |
| What happens during low energy or a fault? | Identify affected components and the resulting service for each head. | Identify which shared components and load channels are affected; do not assume isolation between heads. |
| What must the component schedule show? | Allocation of modules, batteries, controllers and luminaires to A and B. | The common supply, load-channel equipment and the interfaces to both luminaires. |
Neither arrangement is a universal winner. Compare the complete equipment, controls, service plan and site duty. Counting battery packs alone leaves out what they are required to deliver.
Assume a 12-hour night. Head A serves a road and draws 40 W at the complete luminaire input throughout. Head B serves a parking area and draws 40 W for the first five hours, then an assumed 12 W for the remaining seven hours.
The reduced parking state is an input to this illustration. A real project must separately establish the acceptable lighting in that state. The 12 W input is not a claim of 30% illumination on the ground.
↔ Swipe to read both head calculations and the combined total.
| Period | Head A · road | Head B · parking | Combined energy |
|---|---|---|---|
| First 5 hours | 40 W × 5 h = 200 Wh | 40 W × 5 h = 200 Wh | 400 Wh |
| Remaining 7 hours | 40 W × 7 h = 280 Wh | 12 W × 7 h = 84 Wh | 364 Wh |
| Night total | 480 Wh | 284 Wh | 764 Wh = 0.764 kWh |
With separate supply systems, assess the 480 Wh road duty and the 284 Wh parking duty individually. With a shared supply, assess the combined 764 Wh duty and the controls that preserve the two programmes. In both cases, account separately for other system loads and losses along the actual power path.
The peak combined luminaire input in this example is 80 W during the first five hours. The nightly total of 764 Wh describes energy, while 80 W describes a simultaneous load. A component review needs the relevant power, current and voltage limits as well as the energy calculation.
Why an equal split can hide the problem: 764 ÷ 2 = 382 Wh per head is the arithmetic average. Head A actually needs 480 Wh. Two separate systems assessed only against that average would leave the road-side requirement understated by 98 Wh.
For a simple two-night period with no charging, the same assumed programme requires 960 Wh delivered to Head A and 568 Wh delivered to Head B, or 1,528 Wh in total. These are delivered-load requirements. They are not battery nameplate capacities and do not include all losses or auxiliary demand.
The example explains the allocation question rather than recommending a battery size. Voltage, usable operating range, temperature limits and the selected equipment determine how the battery specification relates to delivered energy.
Review collection at the proposed module positions. The lamp directions follow the areas being lit; solar module positioning follows the site's solar resource within the approved mounting arrangement. Two opposing lamp arms do not require two opposing panel orientations.
If two modules are assigned to separate systems, identify which module supplies which load. One side may receive different shading from a tree, building or another part of the installation. Adding both nameplate powers together does not show the energy available to each independent supply.
For a shared supply, document the permitted module configuration and the charging equipment that receives it. The common load schedule is an input to the design, alongside solar conditions, usable storage and recovery after low-generation periods.
NASA POWER's solar-storage guidance identifies consecutive low-solar periods as a storage-planning concern. [2] Evaluate the required night programme through those periods and the subsequent recharge. A favourable annual average cannot establish the night-by-night result on its own.
Keep the complete mounting loads in the pole review as well. Two heads, panel supports, enclosures and arms contribute mass and exposed area at particular positions. The electrical advantage of a proposed arrangement does not establish the adequacy of its shaft, connection or foundation.
Write a schedule for A and B that names the served area, input setting and operating period. If an occupancy function is proposed, state which head it controls and what service remains before and after a detection. “Automatic mode” is too broad to compare two proposals.
For a shared supply, ask how the system responds when stored energy reaches the configured protection or management thresholds. Does it reduce both channels, retain a priority load, or follow another documented strategy? The answer must come from the selected system's behaviour and settings.
For separate supplies, record the equivalent behaviour for each head. Physical separation can define different supply boundaries, but it does not guarantee that one head remains available after every possible fault. Common pole damage, a shared site condition or equipment-specific faults need their own assessment.
At commissioning, verify the intended channels and settings against the as-built labels. A functioning light at dusk is only one operating state. Include the scheduled changes and any agreed low-energy or recovery checks using the manufacturer's procedures.
Use identifiers that connect the two head positions to the component schedule. The person replacing a controller needs to know which luminaire, module and storage assembly it belongs to. A generic “double-arm light” label does not preserve that relationship.
For separate systems, keep the A and B settings, connectors and replacement parts traceable. Similar enclosures can contain equipment assigned to different duties. For a shared system, identify which service action can interrupt both loads and what checks restore both lighting programmes.
Review replacements as changes to the system. A new head with the same advertised wattage may have a different operating voltage, driver, dimming interface or input profile. A battery with the same ampere-hour number may have another nominal voltage or protection arrangement. Match the replacement to the documented equipment and duty.
Include physical access in that plan. Two heads can face different directions and require different removal clearances. Panel supports and enclosures may obstruct a bracket or service cover even when the electrical component selection is suitable.
Start with a plan showing the pole position and the two areas to be lit. Give each head a label and provide its lighting requirement, night programme, proposed mounting position and control behaviour. Add the site information needed for solar and structural assessment.
Ask the supplier to return a coordinated assembly drawing, component schedule and electrical arrangement. The documents should make clear whether the supplies are separate or shared, which resources serve each load and what happens during normal, reduced and low-energy operation.
Then compare the complete scope: pole and arms, luminaires, modules and supports, storage, control equipment, enclosures, interconnections, operating settings and the agreed service documents. That gives the two-head description a practical meaning.
For an enquiry to Yangzhou Jieyao Lighting Equipment Co., Ltd., use the split solar street light range as a starting point and include the two separate lighting duties. The appropriate arrangement follows the site and offered equipment, rather than a rule that every double-arm pole must contain one battery or two.
The two-head 40 W / 12 W programme and all energy results are explicitly assumed calculations by Jieyao Lighting. They are separate from the photographed multi-head installation and the external manufacturer's listed example.
Contact Us
Get a custom lighting solution and quotation for your project.
Yangzhou Jieyao Lighting Equipment Co., Ltd. manufactures outdoor lighting and steel poles in Guoji Town Industrial Park, Gaoyou City, Yangzhou, Jiangsu, China. The company reports a 10,000 m² factory site, more than 60 employees including more than 10 technical personnel, and more than 100 production and testing machines. The present company name dates from 2017; Jieyao Poles’ published history traces the team’s manufacturing lineage to 2006. The stated 15 years of experience refers to the team. The company reports exports to more than 60 countries. Do you have any questions or requests?