- Product details
-
JIEYAO LIGHTING · PROJECT-CONFIGURED SUPPLY
Split Type Solar Street Light for Off-Grid Roads
Place the panel for sunlight and the lighting head for the road.
Jieyao supplies project-configured split solar street lighting with a separately positioned PV panel, LED road luminaire and identified battery enclosure. The package coordinates generation, storage, lighting and the steel mounting parts as one off-grid system. It can give a project more freedom to position the panel without forcing the road optic to face the same direction.
Select the component arrangement around the site and operating programme. The quotation identifies the panel, luminaire, battery, controller, brackets, cables and any buyer-supplied items, with the actual enclosure positions shown on the assembly drawing.
Discuss your project ↗
Separate-panel hardware reference. The battery enclosure and final electrical arrangement follow the selected package.What makes this a split system?
In a split arrangement, separate components can be positioned and serviced around their own functions. The PV module needs useful solar exposure; the luminaire needs the correct road aim; storage needs an appropriate enclosure and access. Those requirements are coordinated through the support design and electrical connections.
Assembly illustration with a separate PV panel, road luminaire and battery-enclosure inset.
Separate-panel support with a braced outreach arm; the battery location is not shown.The selected assembly drawing identifies the equipment and enclosure locations for your order.
A split layout is an option for roads or sites without a dependable mains connection, but separate components do not automatically make a system brighter or give it longer autonomy. The lighting duty, local generation and usable storage still have to work together.
Understand the parts you are selecting
PV module and support
PV module appearance reference; use the selected module’s datasheet for its electrical and mounting values.The framed module has its own outline, fixing positions, electrical output and cable connection. Its support has to hold the selected module at the intended orientation without conflicting with the arm, nearby trees or access to other components. Panel size and mounting interface are part of the order, not details left for site improvisation.
Lighting head and arm
Lighting head and outreach support shown with a separately mounted PV module.The separate lighting head allows its optic and direction to follow the road layout. Identify the fixture, optic, operating input, arm connection and permitted tilt together. A different lamp head can change both the lighting result and the load on the support; a similar nominal wattage does not establish interchangeability.
The hardware reference above shows how a panel and lighting head can share a support while remaining distinct components. It does not identify the final battery position or prove the nightly duty of an offered system.
Battery and enclosure
Separate enclosure examples. The pictured labels identify those packs, not the capacity of every quoted system.The selected pack needs an identified chemistry, voltage, capacity and protection arrangement. Decide where its enclosure can be reached for maintenance and how it is attached. Different enclosure positions change cable lengths, exposure, thermal conditions and equipment loads; moving a battery is a system revision rather than a cosmetic change.
Keep the panel direction independent of the road aim
Installed layout reference; panel orientation and the lighting-head direction are separate design inputs.A road may run in a direction that does not give a panel its preferred solar exposure. A separate-panel arrangement lets the project consider those directions independently, within the approved bracket and cable limits. The luminaire can then be aimed at the road while the PV support is arranged around the actual site.
Check solar access with buildings, present trees and expected canopy growth in view. Consider the season that limits the project rather than only the clearest month. A panel can fit mechanically yet be poorly positioned for replenishing the required nightly energy.
The component layout should also preserve service access. Do not place a panel where its removal blocks the battery or where routine cleaning requires an unplanned access method. The assembly drawing coordinates those relationships before the pole and brackets are fabricated.
Compare split, all-in-two and integrated arrangements
On a phone, swipe the table sideways to read all columns.
Arrangement What it describes Useful comparison Split configuration Panel and road head are separate; battery enclosure is identified as a distinct service element Independent component positioning, interconnection and maintenance access. All-in-two configuration A separate panel with more storage or electronics combined with the lighting body in some designs The exact internal component locations and what remains separately serviceable. More integrated configuration Additional functions packaged within a compact unit Whether the packaged panel direction, storage access and fixture aim suit the site. Supplier labels vary, so compare assembly drawings rather than treat a name as a performance grade. A compact unit may simplify some mounting interfaces; a split arrangement provides more positioning choices but creates additional brackets, cables and connections to specify. The integrated and split comparison develops these layout choices.
Set the lighting programme before the energy package
Begin with the surfaces to illuminate and the operating periods. Road width, crossings, pedestrian edges, mounting height, spacing and nearby properties shape the luminaire and optic selection. The lighting proposal should identify the exact configuration and its calculation, rather than call a road suitable for one advertised wattage.
The night programme then defines energy demand. An early full-output period and a later dimmed period consume different amounts, and any motion or timed control must be compatible with the selected controller and luminaire. Use the actual operating input for each stage rather than assume the catalogue lamp rating is drawn continuously throughout the night.
Local solar resource, orientation, shading, module temperature and system losses shape replenishment. Usable battery energy also depends on the selected pack’s limits, temperature and condition. Compare autonomy proposals with the same lighting stages and weather assumptions; a statement about “rainy nights” without that basis cannot make two bids equivalent.
A larger battery alone cannot compensate indefinitely for inadequate generation or an overly demanding programme. Likewise, a larger panel does not prove the required operating duration unless the charging, storage and load are compatible. These relationships are assessed for the proposed site and complete component set.
Make the controller and interconnections identifiable
Controller component reference. The offered model and wiring instructions identify the actual functions and connections.The controller coordinates the selected solar, storage and lighting functions. The offer should identify its voltage compatibility, charging requirements, load interface and supported control programme. A labelled cable set is useful only when its functions match the supplied model’s wiring information.
Record the actual PV module electrical data and how the chosen modules are connected. A combined power rating does not determine a safe controller input or a valid series/parallel arrangement. The battery and driver also need their specified electrical and protection interfaces.
Separate parts create connections that need a defined cable route, compatible connectors, protection and physical support. Include the cable lengths and any buyer-supplied links in the parts schedule. The product instructions govern assembly of the selected equipment; this page does not substitute a universal terminal sequence for those instructions.
Coordinate storage, pole and foundation details
Pole access detail reference. Enclosure location and electrical service access are defined on the selected assembly drawing.A pole-mounted enclosure needs its fixing detail, service clearance and environmental arrangement. A separately located enclosure needs the corresponding cable route and installation scope. The enclosure should be selected for the actual battery and site conditions rather than judged by its apparent size.
The steel design includes the panel, lamp, enclosure and brackets as attached equipment. Identify their masses, exposed areas and mounting positions with the pole and arm geometry. Panel tilt or battery-location changes can affect more than the energy calculation.
At the base, coordinate the flange or other support connection, foundation hardware, cable entry and electrical provisions. Solar supply does not remove the need for the project’s earthing, protection and installation design. The battery environment and enclosure guide explains the storage-location questions in more detail.
Apply the layout where its separation is useful
Roads with restricted panel orientation
Use the site plan to separate the road-facing optic from the solar-facing module. Confirm that the chosen support actually permits the arrangement, with cable travel and attachment loads included. A remote, rural or industrial-road label by itself does not establish suitability.
Sites with a defined service route
Choose enclosure and controller positions around how the operator will inspect and replace components. Record the means of reaching them, room to handle the pack and the component identification needed for later service.
Extensions and retained supports
A new solar package on an existing pole needs a structural and interface review, not just a matching mounting clamp. Compare the complete new attachments, cable route and access needs against the retained asset’s design and condition.
Manufacture and assemble around one configuration
Welding a connection on a tubular steel lighting support.The steelwork stage defines the shaft, arm, panel support, enclosure mounting and base interfaces. Drawings should show the component positions and the cable paths that matter to installation. The required weld, finish and dimensional checks can then be related to identifiable parts.
Before assembly release, keep the photometric proposal, energy assessment, mechanical drawing and bill of materials under the same configuration revision. If a panel, optic, battery or control scene changes, reassess the affected interfaces and calculations rather than carry forward the previous performance statement.
Agree checks for component identity, bracket fit, connectors, wiring and programmed operation. A demonstration that the light switches on verifies that condition; it does not establish the seasonal generation or cloudy-weather duty. Any destination compliance or product-test requirement needs evidence applicable to the actual component and configuration.
Define the shipment and the handover
On a phone, swipe the table sideways to read all columns.
Supply item Identify with the selected package Handover purpose Solar and storage equipment Panel, battery, enclosure and controller models with compatible connections Keeps the energy and service arrangement identifiable. Lighting equipment Luminaire, optic, driver and operating settings Connects the delivered head to the lighting proposal. Steel and fixings Pole, arm, PV/enclosure supports and named foundation hardware Matches loose parts to the approved assembly. Cables and accessories Lengths, connectors, supplied protection and buyer-supplied links Defines the installation boundary. Documents Assembly drawing, wiring instructions, settings and maintenance information Supports installation and compatible replacement parts. Protect module faces and edges, optical surfaces, coated steel and connectors for the agreed handling route. Identify battery packaging and transport documentation for the selected pack. Group loose supports and electrical sets by the pole mark so the receiving team can account for the complete package.
Foundation works, installation, access equipment and commissioning should be assigned expressly. Delivery time, freight and warranty conditions follow the written offer. Keep the accepted component revisions, settings and installation records for later maintenance instead of relying on the original product photographs alone.
Useful configuration references and planning guides
The project-configured split solar product includes a separately documented drawing example. The linked drawing describes its own configuration; component models and quantities for your order are listed separately. The tender checklist helps structure a project requirement, and the installation guide covers planning and assembly coordination alongside the exact product instructions.
Frequently asked questions
Is a split system always brighter than an integrated unit?
No. The optic, output, mounting and road calculation determine lighting performance. Component separation describes the layout, not an output class.
How many cloudy nights will it operate?
Use the selected pack’s usable energy, lighting programme and the specified local weather case. A universal night count is not stated for this range.
Can the panel face a different direction from the light?
A split layout can allow separate positioning, subject to the bracket, cable and structural limits shown on the assembly drawing.
What happens if the battery location changes?
Review service access, cable length, protection, thermal conditions and mounting loads, then update the configuration documents.
Does a photograph define the battery or panel capacity?
No. Use the component identification and datasheets in the accepted offer. Appearance references are not an equipment schedule.
Can this page be used to specify mains-backup operation?
Mains-complementary operation needs an identified additional supply and compatible control arrangement. It is a separate configuration, not a feature inferred from an off-grid split layout.
Plan the split solar package around your road
Send the installation country, quantity, road layout, required lighting periods and site solar constraints. Include the preferred component positions, pole and foundation limits, maintenance approach and delivery destination. Jieyao can organize the proposed lighting, energy and mounting package with a defined component schedule and supply boundary.
Contact Jieyao ↗ -
-
