2-in-1 Solar Street Lights: Where Are the Battery and Controller?

Explore the page details below, or contact Jieyao Lighting to discuss your outdoor lighting requirements.

Discuss Your Project
2-in-1 Solar Street Lights: Where Are the Battery and Controller?
Home > Blog

2-in-1 Solar Street Lights: Where Are the Battery and Controller?

Jieyao Lighting · Solar system layout guide

The battery and controller can be in different assemblies. ZGSM’s PV6 documentation places them inside the luminaire, with a separate solar panel. Sol’s 2025 UP2 documentation groups the battery and energy-management electronics with the panel assembly, while the light fixture is separate. Both are described as all-in-two systems. Read the model’s component drawing to establish what its “two” assemblies contain. [1] [2]

This difference matters when choosing a replacement battery, planning access or comparing two quotations. Two systems can look similar from the ground yet place the part that needs attention in a different location. The location drawing should identify the enclosure and the component inside it.

What the exterior shows

Two documented layouts

Service implications

Read the offered drawing

A separate panel and lamp do not reveal everything inside

AGNI-labelled solar street light with a separate photovoltaic panel and LED head

Separate solar panel and LED head — an exterior layout example.

The photograph makes the panel and light head easy to distinguish. It shows a different product from the PV6 and UP2 examples discussed below. The closed housings do not establish the battery or controller position. That information comes from the matching component drawing, parts schedule or service document.

Terms such as 2-in-1, all-in-two and semi-integrated appear in product descriptions. For selection, ask which functions have been grouped into each assembly: solar collection, energy storage, charging and lighting. Counting the visible panel and head leaves the electrical grouping unresolved.

Our existing integrated and split solar-light comparison covers the broader packaging decision. This guide follows two published assemblies to make the battery and control locations concrete.

Two documented all-in-two layouts

The examples below come from the named manufacturers’ documents. Their grouping differs even though both use an all-in-two description. The diagrams here simplify those groups into labelled boxes; they are not product drawings or wiring instructions.

Example A: battery in the luminaire

ZGSM PV6 · component grouping schematic

Separate panel assemblyPhotovoltaic panel

Electrical connection between assemblies

Luminaire assemblyLED lighting componentsBatteryMPPT controller

Example B: battery at the panel

Sol UP2, 2025 document · component grouping schematic

Solar generator assemblyPhotovoltaic panelsBatteryEnergy-management electronics

Electrical connection between assemblies

Separate luminaireLED lighting components

Component grouping in two published examples — schematics, not to scale.

ZGSM PV6: the lamp housing contains storage and control

Page 4 of ZGSM’s PV6 specification shows a separate solar module and an exploded luminaire assembly. The drawing labels a lithium battery and an MPPT smart controller within the lamp body, alongside its lighting components. This is a documented example of an all-in-two layout with storage and charging control at the luminaire. [1]

For a layout grouped this way, the service plan needs to address access to the lamp housing when the battery or controller requires attention. The panel bracket’s position alone does not describe that work. Whether a particular component is separately replaceable, and how the housing is opened and resealed, follow the matching service instructions.

Sol UP2: storage and energy management are grouped with the panel

The second PDF page of Sol’s 2025 UP2 document shows the battery and SunnaCore energy-management electronics in the solar generator assembly, above the separate light fixture. Its electronics description includes an integrated LED driver. Sol’s January 2021 introduction also describes the UP series with storage and energy management at the solar-panel assembly. These sources establish the grouping; the 2025 document is the version used here. [2] [3]

That changes where an owner should look when identifying a storage or control part. Replacing only the separate light fixture would not replace components grouped at the solar generator. A service plan should identify both assemblies and the connection between them.

What changes when the battery moves?

The immediate difference is the assembly that contains the part. That affects the information needed for access, component identification and replacement. It does not, by itself, establish which system lasts longer or delivers more light.

↔ Scroll the comparison to the last column. Keyboard users can focus the table area and use the arrow keys.

Follow the component, then plan the work
Item to locateBattery grouped in the luminaireBattery grouped at the panelWhat the offered documents should show
Battery accessIdentify the battery space in the luminaire assembly.Identify the battery space in the solar generator assembly.Access cover, handling method and the compatible replacement pack.
Charging and controlFollow the controller identified in the lamp assembly.Follow the energy-management electronics at the solar generator.The functions included in each electronic unit and its interfaces.
Connection between assembliesTrace the panel connection to the lamp assembly.Trace the solar generator connection to the light fixture.Cable schedule, connector identity, electrical duty and protection.
Replacing only the light headEstablish whether the proposed replacement also includes storage or controls.Establish which storage and control parts remain at the solar generator.A parts schedule that distinguishes a head-only replacement from a complete system.

The table is a planning interpretation of the two groups, rather than a maintenance procedure for either brand. Access height, tools, isolation, connectors and resealing must follow the selected assembly. A closed housing may contain several service parts, or it may be supplied as a larger replacement unit.

Location also changes the mounting review. Identify the actual mass at the panel support and at the lamp connection. A two-piece description does not supply those loads. Equally, a battery beside a panel or inside a lamp still needs suitable temperature limits and protection for the offered configuration.

How to read the drawing for the system you are buying

Start with the outline assembly drawing and mark the panel, battery, control electronics and LED light engine. Then match each label to the parts schedule. If a supplier uses “power module” or “solar engine,” ask which of those functions the module includes.

  1. Match the model and revision. Use the same offered system on the assembly drawing, component schedule and electrical diagram. A generic family illustration may show another arrangement.
  2. Locate each enclosure. Mark the battery and electronic units inside it. Record which opening provides access and which bracket supports that enclosure.
  3. Trace the connections. Identify the cable endpoints and the functions carried between assemblies. Appearance alone cannot distinguish a charging connection from an LED supply connection.
  4. Define the replacement boundary. Ask what a spare “lamp,” “battery module” or “solar unit” includes, and retain the compatible part identifiers.

This check can expose an ambiguous offer without turning the enquiry into a full redesign. For example, if an outline shows a panel and lamp but lists a battery only in a generic specification, the missing item is its location and assembly reference. If an electronics module includes the LED driver, the replacement schedule should retain that functional boundary.

Once the grouping is clear, size the system for the site. Use the battery and solar-panel calculation guide for energy requirements. Placing a battery in one enclosure rather than another does not determine its usable energy or rainy-day backup.

Two practical questions

Can I replace a battery with another pack that physically fits?

Physical fit is only one check. Match the specified chemistry, electrical limits, protection, connectors and control compatibility as well as the mounting and enclosure requirements. The approved replacement information should identify the complete pack.

Does an MPPT controller replace the LED driver?

MPPT describes a solar charging function. LED driving is another function, although a manufacturer may combine functions in one electronic unit. The UP2 document explicitly describes an integrated driver in its EMS; do not assume every controller uses that arrangement.

Specify the arrangement as well as the name

For a Jieyao project enquiry, include a component-location sketch alongside the road layout and operating schedule. The split-type solar street-light page is the related product starting point. Identify what belongs in the panel assembly and what belongs in the lamp so that the quoted configuration and future spare parts describe the same system.

Documents used for the two examples

[1] ZGSM, Series PV6 All-in-Two Solar Street Lights, PDF page 4: component-location drawing of the luminaire and separate panel.Source: https://www.zgsm-china.com/wp-content/uploads/2024/09/Specification_Series-PV6-All-in-Two-Solar-Street-Lights.pdf#page=4

[2] Sol, UP2, 2025 document, PDF page 2: solar-generator components and separate fixture. This is the UP2 version discussed here.Source: https://solarlighting.com/wp-content/uploads/2022/10/sol-up2-2025-atbmic.pdf#page=2

[3] Sol, Introducing the iSSL and UP Series solar lights, January 2021: earlier description of the UP-series component grouping.Source: https://solarlighting.com/solar-lighting-blog/introducing-the-issl-and-up-series-solar-lights/

Contact Us

Get a custom lighting solution and quotation for your project.
Jieyao Lighting Yangzhou Jieyao Lighting Equipment Co., Ltd. manufactures outdoor lighting and steel poles in Guoji Town Industrial Park, Gaoyou City, Yangzhou, Jiangsu, China. The company reports a 10,000 m² factory site, more than 60 employees including more than 10 technical personnel, and more than 100 production and testing machines. The present company name dates from 2017; Jieyao Poles’ published history traces the team’s manufacturing lineage to 2006. The stated 15 years of experience refers to the team. The company reports exports to more than 60 countries.

Do you have any questions or requests?

Email: jay@jieyaolighting.com
Tel: +86 13815843784
WhatsApp: +86 13815843784
Contact
Copyright © 2026 Yangzhou Jieyao Lighting Equipment Co., Ltd. All rights reserved
×
Send Your Inquiry Today
We use cookie to improve your online experience. By continuing to browse this website, you agree to our use of cookie.

Cookies

WhatsApp avatar

Click to Chat.

Im online now.

Hey, I'm Xu Jie from Jieyao Lighting. What can I do for you? Welcome to contact me, WhatsApp: +86 13815843784

WhatsApp Us

WhatsApp us