  • Product details
  • JIEYAO LIGHTING · STEEL MASTS AND COORDINATED LED EQUIPMENT

    LED High Mast Lighting Poles and Equipment Packages

    Steel masts, pictured lighting-head choices and a defined fixed or lowering equipment package.

    Jieyao supplies project-configured steel high masts and coordinates the lighting heads, mounting hardware and named electrical or lowering equipment required for the order. Start with a steel mast and headframe, or request a coordinated package with luminaires and the specified accessories.

    For yards, terminals, public spaces and road interchanges, the useful choice is the complete arrangement: where the lights point, how they are maintained, what the steelwork carries and which parts arrive together.

    SupplySteelwork or a defined equipment packageHead layoutRadial, opposed or directionalServiceLowering or planned fixed-head access
    Circular steel lamp carrier with outward-facing floodlights
    Circular carrier reference. The exact head and equipment schedule are defined for each order.

    01 / CHOOSE THE LIGHTING HEAD

    Three head arrangements, with different aiming priorities

    Choose the head layout for your target area, then select fixed or lowering maintenance access and the items included in the offer. These photographs show the mounting forms available for configuration discussions; the accepted drawing identifies the supplied assembly.

    Radial circular carrier

    Floodlights distributed around a circular steel carrier
    Radial bracket positions around a central mast.

    A starting point where useful lighting directions extend around the mast. Individual brackets let the lighting layout assign different targets to different heads rather than treating the ring as one uniformly aimed source.

    Best fit: open yard or junction layouts with target areas on several sides.

    Choose with: the head diameter, bracket positions, actual fixture geometry and required aiming clearance. Confirm separately whether the carrier is fixed or lowers.

    Opposed floodlight rack

    Galvanized rectangular rack carrying floodlights on opposite faces
    Opposed mounting faces on a compact headframe.

    Places luminaires on different faces of a rack, useful when the mast sits between two target areas. The two sides can be assigned different optics or aiming angles if the lighting design calls for them.

    Best fit: layouts with separated work zones, routes or areas on either side of a mast position.

    Choose with: clearance behind each fixture, bracket access, wiring routes and the loads from every fitted head. Symmetrical appearance does not require identical electrical circuits.

    Directional crossarm head

    Steel crossarms carrying individually aimed floodlights
    Physical crossarm head with several yoke-mounted fixtures.

    Concentrates mounting positions along crossarms. It is a useful starting form when the permitted mast location is beside the area rather than near its centre, and the beam directions need a defined relationship to the site edge.

    Best fit: yard boundaries, stands and working areas reached from an edge position.

    Choose with: the target plan, spill-light constraints, individual aiming range and the maintenance route. The final direction of each lamp follows the calculation and aiming schedule.

    What the pictures help you choose: mounting form and access space. The final drawing identifies the actual lamp count, supported mass, exposed area and connection details; these are not measured from a photograph.

    For a closer comparison of maintenance arrangements and head layouts, see the visual high mast selection guide.

    02 / MAINTENANCE ARRANGEMENT

    Choose access before fixing the head design

    Lamp replacement is only one service task. Drivers, connectors, brackets and aiming adjustments also need a workable access plan.

    Lowering lamp carriage

    Radial lamp-support arms and floodlights around a mast shaft
    Lamp-carriage construction reference. Confirm its travel, suspension and retention arrangement in the selected system documents.

    The carriage brings the supported lighting equipment to an agreed service position around the mast. This can make sense where routine access by a high-level vehicle is difficult or disruptive, provided there is space below for the carriage and maintenance activity.

    The package needs matching winding equipment, ropes, guides, support or retention hardware, cables and controls. Identify which equipment moves and how it is supported in its working position. The selected mechanism’s instructions govern operation and maintenance.

    • Keep the service area clear of barriers, parked equipment and stored goods.
    • Coordinate fixture clearance, cable movement and carriage travel.
    • Define the moving assembly and rated system together.

    Fixed lighting head

    Crossarm lighting head with yoke-mounted floodlights
    Crossarm appearance reference. Access provisions are a separate design item.

    A fixed head keeps the lighting support in its operating position. It can be a practical choice where a suitable access vehicle and a planned maintenance route are available, or where the project specifies a fixed service arrangement.

    Compare the equipment cost with the continuing need for access, work windows and traffic management. A fixed head does not automatically include a ladder or platform; those features need their own defined design and supply scope.

    • Reserve an access-vehicle position and a suitable route to it.
    • Check working reach against the actual lamps and brackets.
    • Plan isolation, maintenance and re-aiming around site operations.

    03 / A REAL CONFIGURATION TO START FROM

    A documented 25 m lowering-mast example

    A Jieyao project record for Yancheng describes the following steel mast and lighting arrangement. It provides a concrete starting point for discussing a package, rather than a universal specification for every 25 m mast.

    Workshop view of a mast flange and shaft connection during fabrication
    Fabrication photograph included in the Yancheng project record.
    25 mRecorded mast height
    12 × 400 WRecorded light-source schedule
    3 sectionsSlip-joint shaft arrangement
    6 / 6 / 6 mmRecorded section wall thicknesses

    The recorded source-power total is 4,800 W from 12 × 400 W. That arithmetic is not a measured complete-system input or a lighting-performance result.

    The project record identifies Jieyao as the supplier and describes cutting, forming, welding and flange fabrication. It does not provide the dimensions, foundation design or measured illuminance needed to transfer this configuration directly to another site.

    For a new order, the mast, head, fixture schedule and foundation interface are developed around that project’s loads and lighting layout. A higher mast, more lamps or a different bracket can change several parts of the package at once.

    SpecificationRecorded exampleWhat defines your supplied package
    Mast and maintenance25 m lowering mastSpecified height, operating arrangement and service position on the approved assembly drawing.
    Shaft arrangementThree slip-jointed sectionsSection sizes, overlap, jointing instructions, transport lengths and erection sequence.
    Section wall thickness6 mm / 6 mm / 6 mmSteel grade and section thicknesses tied to the structural design; not copied from mast height alone.
    Lighting schedule12 sources rated 400 W eachIdentified fixture models, optics, actual inputs, bracket interfaces and aiming schedule.
    Base connectionFlange-connected mast describedBase plate, bolt pattern, anchorage and the corresponding foundation interface.
    Project performanceNo measured lighting results supplied in this recordProject lighting calculation and any agreed site verification using the selected equipment.

    Download the 25 m configuration reference sheet for the recorded mast and light-source schedule. It is a configuration summary, not a structural calculation or measured lighting report.

    04 / CONSTRUCTION DETAILS

    The interfaces that make the package fit together

    Installed steel mast base with stiffeners, anchor bolts and concrete foundation
    Installed base-interface reference. This photograph is not the Yancheng foundation design.

    Base flange, anchors and cable entry

    The base connection transfers the supported assembly into the foundation. Bolt layout, plate geometry, stiffening and cable entry must agree with the civil interface drawing before the foundation work is committed.

    For an existing foundation, send the actual bolt survey and condition information. Similar-looking bolt circles do not establish a compatible replacement. For a new foundation, the site designer needs the agreed mast reactions and local ground information.

    Section joints and erection marks

    A sectioned shaft makes transport and handling manageable, but it creates an assembly interface that must be preserved. Identify section order, orientation, joint arrangement and any required overlap or fit instructions on the supplied drawing.

    Use the order’s lifting and assembly procedure. Packed length, individual section mass and lifting points matter to the site plan just as much as the final mast height.

    Coordinate the civil interface using the high mast foundation and anchor-bolt design inputs; the actual soil and approved mast reactions remain project inputs.

    Carrier brackets and aiming clearance

    The carrier connects the floodlight yokes to the mast assembly. Check the actual fixing pattern, adjustment space and access to fasteners. A lamp that fits the bolt holes may still be obstructed when tilted or when its rear cover needs to open.

    Aiming schedules should identify lamp positions so installers can reproduce the intended directions. Distinguish an aiming adjustment from a change to the steel support or to the approved equipment loading.

    Winch, drive and controls

    For lowering equipment, coordinate the winding unit with the moving carriage and the complete rope and retention arrangement. Specify the supplied manufacturer and model, operating accessories and electrical interface.

    The component rating and its operating conditions remain separate from motor power. A higher-powered drive is not an approval to add more lamps to an existing carriage.

    Explore winch and drive components →

    For carrier-only enquiries, review the luminaire mounting rings and steel headframes with the existing mast and fixture interfaces.

    Double-drum mechanical winch carrying wound steel rope
    Physical winch reference. The supplied system identifies the selected model and rating.

    05 / LIGHTING CONFIGURATION

    Choose the useful light distribution, then finalize the equipment

    Lamp wattage and quantity describe part of a package. They do not explain where the light lands, how evenly it reaches the work area or what people see from surrounding routes.

    Optics and mounting

    Match each fixture’s photometric file to the proposed optic and operating configuration. Use the actual mounting height, tilt and position in the calculation, including buildings, equipment or stored material that affect the target area.

    Several lower-output heads with suitable optics may distribute light differently from a smaller number of higher-output heads. Compare calculated results and the associated steelwork and electrical scope.

    Colour, controls and operating stages

    State required colour temperature and colour-rendering criteria where they matter to the task. Identify the controls to be supplied, their interface and the nightly operating stages.

    Separate switching groups can follow different working zones. Dimming needs a compatible driver and control arrangement; it should be named in the offer rather than assumed from an LED label.

    Glare and neighbouring areas

    Review sightlines for drivers, workers and nearby properties alongside the useful target surfaces. Pole position, optics and aiming are considered together; a shield is an equipment choice, not a substitute for the lighting layout.

    For sports or camera-sensitive tasks, state the actual event and image-capture requirements. Agree the applicable criteria rather than attach a broadcast or competition claim to lamp power.

    Useful quotation input: send the site plan, intended tasks and acceptance criteria. If a tender specifies values, include the document and applicable version so the calculation and offered equipment answer the same requirement.

    After the equipment and layout are selected, the floodlight aiming and glare commissioning checklist explains the handover information needed to reproduce the planned directions.

    06 / APPLICATION-LED SELECTION

    What changes from one site to another?

    High masts illuminating a logistics terminal with truck parking and circulation roads
    Application reference: terminal layout with parking rows, vehicle routes and working areas.

    Logistics and industrial yards

    Night-time lighting of an outdoor distribution yard
    Application reference, not a named Jieyao project.

    Start with vehicle routes, loading positions, stock areas and pedestrian interfaces. A mast position that is convenient for foundations may be screened by trailers or changing stock heights.

    Compare edge-mounted directional heads with centrally placed radial heads against those obstructions. Keep lowering space or access-vehicle routes available after the site is in use, not just during construction.

    Ports and open terminals

    Port terminal with quayside working areas and surrounding water
    Application context for exposed terminals.

    Equipment movement and restricted working zones can dictate mast positions. Include cranes, ship-side activity and changing storage patterns in the lighting brief.

    Exposure, cleaning access and maintenance windows influence coating and equipment selection. The corrosion-protection schedule should describe the actual environment and system; coastal location alone does not define a service-life guarantee.

    Airport stands and service areas

    Airport tower with a floodlighting mast at dusk
    Airport application reference.

    Permitted mast positions and spatial restrictions come first. Coordinate the head with stand geometry, aircraft movement and ground-service access, then review aiming and maintenance windows.

    A general high-mast package is not an aviation approval. Use the airport’s project criteria and responsible design review for the proposed equipment and location.

    Airport apron mast packages →

    Public squares, parking and road interchanges

    Account for the way people and vehicles approach the site, the location of adjacent homes and the available maintenance access. A centrally located mast can distribute light in several directions, but the calculation still needs to distinguish parking bays, traffic lanes, crossings and landscaped areas.

    Sports grounds and multi-use venues

    Identify the playing or activity surfaces, viewing positions and any camera requirements. A high mounting position is one design variable; required illuminance, uniformity, glare and image quality must be checked for the actual venue and use. Do not select a package solely because a similar-looking head appears at another ground.

    07 / FINISH AND ENVIRONMENT

    Specify the coating system, not just the colour

    Galvanized steelwork

    State the galvanizing and inspection requirements in the steelwork specification. Include relevant hollow-section details, accessible surfaces and the treatment of joints and fittings so the coating process is coordinated with fabrication.

    The appearance of zinc coating in a photograph does not determine its thickness or a corrosion category.

    Additional paint or powder finish

    Where a coloured finish is required, define the surface preparation, coating system and colour reference together. Agree which parts receive that system and how mating surfaces, fasteners and identification marks are handled.

    A powder finish, marine paint or fluorocarbon system is not an interchangeable label. If one is specified, confirm that exact system and its documentation in the order.

    Transport and site touch-up

    Protection continues through packing and erection. Specify separation at contact points, protection for flange faces and brackets, and the accepted handling and repair procedure for any damage.

    Site repairs should follow the selected coating specification. Uncontrolled overpainting can hide a damaged interface without resolving it.

    08 / FROM DRAWING TO FABRICATION

    Production follows the agreed mast assembly

    Fabricated mast section and flange connection in a workshop
    Steelwork fabrication photograph from the documented project.

    Release the interfaces before cutting steel

    The mast drawing should identify section arrangement, head connection, access openings and the base interface. The equipment schedule gives the lighting and maintenance hardware that the steelwork must accommodate. Resolving these together reduces the risk of a bracket, cable route or door conflicting with another part.

    Form, weld and connect

    Jieyao’s project record describes mast cutting, forming, welding and flange processing. For the actual order, the agreed design and inspection plan define the steel material, section geometry and weld requirements. Record checks against component marks so the delivered steelwork can be reconciled with the order drawing.

    Finish with the assembly in mind

    Coating, identification and any required fit checks need to preserve the designed connections. Keep component marks legible and coordinate what is assembled before dispatch with what must be joined on site.

    09 / INSPECTION AND DOCUMENTS

    Check the steelwork, mechanism and lights as distinct parts

    Steelwork and fit

    Mast base flange, stiffeners and anchor bolts
    Base-interface reference for the steelwork check schedule.

    Agree checks for section identity and dimensions, joints, flange and bolt-hole arrangement, access openings, head interfaces and finish. Any specified weld examination or coating measurement should have an agreed method and acceptance basis.

    Ask for: the order drawing, component marks and the inspection records required by the purchase specification.

    Lowering equipment

    Close view of a technician examining a winch gear and shaft
    Mechanism-inspection reference; no rated-load result is inferred.

    Confirm the selected mechanism, included accessories and its compatibility with the moving assembly. Define any fit or function check and the equipment and conditions used to perform it.

    Ask for: model identity, interface information and the selected manufacturer’s installation, operating and maintenance documents.

    Lighting and controls

    Luminaire being measured using photometric laboratory equipment
    Photometric measurement setup. Product data must match the selected fixture.

    Match reports and photometric data to the actual fixture and optic. Keep electrical checks, control-stage verification and the lighting calculation separate from steelwork acceptance.

    Ask for: the exact fixture schedule, applicable product documents and the agreed control description.

    The quotation should name which records and checks are included. A company qualification, a component report and an installed-system acceptance record answer different questions.

    10 / PACKING, DELIVERY AND SITE HANDOVER

    Make every section and loose part identifiable

    A package the receiving team can reconcile

    Organize the packing list around the actual assembly: mast sections, head members, brackets, fixtures, mechanism, controls and loose hardware where supplied. Identify shared accessories and parts packed separately so the receiving team does not assume a missing carton belongs to another mast.

    Agree packed lengths, individual weights, lifting and unloading arrangements from the released design. Protect exposed connections, coating contact points, fixture faces and cable ends. The loading plan needs to reflect the final pieces, not only the mast’s nominal height.

    Documents that travel with the order

    Include the approved assembly and interface drawings, parts list, equipment identities and the relevant installation and maintenance instructions. The site team should be able to match a marked section or accessory to the same revision used for procurement.

    Delivery destination, shipping terms, unloading, civil works, electrical connection and commissioning should each have a clear responsible party. Agree project lead time after the scope and released configuration are established.

    Workers loading wrapped steel pole components into a shipping container
    Pole-component loading reference. Packing and transport arrangements are defined for the order.

    11 / WHAT TO INCLUDE IN THE OFFER

    Compare like-for-like supply packages

    Steel mast and headframe

    Mast sections, specified headframe and named steel fittings. List anchor hardware and templates separately if required. A steelwork quotation should not be read as including fixtures, lowering gear or controls unless they are listed.

    Useful when: the buyer has nominated lighting or maintenance equipment and needs coordinated steelwork interfaces.

    Mast with lighting equipment

    The identified steel assembly plus the selected luminaires and named electrical accessories. State whether drivers, control devices, internal cabling and external distribution equipment are included.

    Useful when: the light calculation and fixture schedule need to arrive with the supporting assembly.

    Mast with lowering equipment

    The defined moving carriage, matching mechanism and listed ropes, guides, retention hardware, cables and operating accessories, together with the named steelwork and lighting scope.

    Useful when: the maintenance plan depends on lowering the lighting assembly. Site works and commissioning remain explicit offer items.

    For the broader design sequence and responsibilities, use the high mast system design and RFQ guide. This product page identifies the head, maintenance and equipment choices to be named in the supply offer.

    12 / ORDER DEVELOPMENT

    Move from a site brief to an identifiable package

    1. Share the site and task. Establish target areas, permitted mast positions and maintenance access.
    2. Compare the supply arrangements. Select the pictured head form, service method and equipment scope.
    3. Coordinate the interfaces. Resolve the steel assembly, fixture mounting and civil/electrical connection information.
    4. Release one agreed revision. Tie fabrication, checks and packing to the accepted assembly and equipment schedule.
    5. Receive against the supplied documents. Reconcile marked parts and complete the agreed site commissioning.

    13 / FREQUENTLY ASKED QUESTIONS

    Questions that affect the order

    Can you quote from our existing mast drawing?

    Send the drawing and revision, equipment schedule and required quantity. Identify which parts remain fixed and which may change. If the lamps, head or maintenance arrangement are revised, review the affected steelwork and interfaces before treating the drawing as ready for manufacture.

    Can the same mast carry more floodlights later?

    Additional lamps change mass, exposed area, electrical demand and possibly the moving load. Spare bracket space is not an approved reserve capacity. Have the actual mast, head and maintenance arrangement reviewed for the proposed additions.

    Does a taller mast always need fewer lighting positions?

    No. Height changes distribution, aiming and structural requirements, but the result also depends on the site geometry, optics and lighting criteria. Compare complete layouts rather than replacing several positions with one taller mast by assumption.

    Can you supply only the ring or winch?

    A component enquiry is possible, but it needs the mating equipment identity and interfaces. State whether you need steel carrier parts, a winding unit, a drive or a complete matched package. Physical similarity is not sufficient evidence of compatibility.

    Are the application photographs completed Jieyao projects?

    The application photographs illustrate site and equipment arrangements. The Yancheng configuration is separately identified from a supplied company project record; the other reference scenes are not presented as named Jieyao deliveries.

    What determines the final price and delivery schedule?

    The released steelwork, lighting and mechanism scope, quantities, finish, documentation, packing and destination all affect the offer. Quoting against one agreed schedule makes it possible to compare suppliers without omitting components or site responsibilities.

    LET’S DEFINE YOUR PACKAGE

    Send the layout. Tell us how the mast will be maintained.

    We can organize the enquiry around the steel mast, head arrangement and the equipment you want included. A clear preliminary brief is enough to start; label any dimensions or equipment choices that are still provisional.

    Discuss your high mast project ↗

    Include these project inputs

    • Location, quantity, site plan and proposed mast positions
    • Required height or spatial restrictions
    • Lighting criteria, fixture preferences and operating stages
    • Fixed or lowering access and available service space
    • Steelwork, mechanism, lighting and electrical supply boundary
    • Required documents, finish and delivery destination

FAQ,If you have any other questions, please contact us immediately

What is the wind resistance of your high mast poles?

Wind resistance is project-specific, not a single standard speed. Confirm the site wind basis, exposure, mast height, headframe and fixture loads, then review the approved structural calculation and foundation interface for the exact offered pole.

How do I choose the right LED power for high mast lighting?

Select high mast floodlight power from a project photometric calculation, not a fixed wattage by pole height. Check target illuminance, uniformity, glare, mounting geometry and the exact IES/LDT file.

What is high mast light, and where is it typically used?

High mast light refers to poles typically 20m (65ft) or taller. It is widely used in airports, seaports, highways, stadiums, and logistics hubs to provide uniform illumination over a vast area.

High Mast Pole Steel Grades: Is Q345B Always Better Than Q235?

A steel grade alone does not establish high mast wind or fatigue performance. Compare project loads, shaft details, mill certificates and approved calculations before fabrication.

Can your fixtures pass high-standard salt spray tests?

Match salt-spray requirements to the specified coating system, test specimen, method and acceptance criteria. Request a report applicable to the proposed finish.

What Are the Most Common Heights for High Mast Poles?

High mast poles are designed for large-area outdoor lighting, and their height usually depends on the size of the space that needs to be illuminated.

What material is used for the high mast poles?

We use high-strength carbon steel such as Q235B or Q345B, bent into polygonal shapes (usually 12 or 16 sides) and hot-dip galvanized both internally and externally.

Fixed vs Raising/Lowering High Mast Light Systems

Raising & Lowering systems feature an electric winch to lower the light ring to ground level for maintenance. Fixed systems require a bucket truck or ladders for servicing.

How does the lifting system of a high mast light work?

It consists of an electric winch, stainless steel wire ropes, pulleys, and an automatic latching mechanism. Once reaching the top, the ring locks mechanically to relieve tension from the ropes.

Will the light ring fall if the wire rope breaks?

Check the exact lowering system, ring position and load path. Verify the locking and failure-protection arrangements in the manufacturer’s procedures and test records.

Do high mast poles include lightning protection?

Yes. Each pole is equipped with a lightning rod at the top and dedicated grounding bolts to connect to the foundation grounding system.

What type of lenses are used for high mast lighting?

We use professional asymmetrical optical lenses (such as Type IV or Type V) to ensure uniformity over large areas and minimize glare.

What is glare control in high mast lighting?

Through shields and precise light distribution design, we confine excess light to the target area, reducing interference for the surrounding environment and drivers.

How is the foundation of a high mast pole constructed?

A concrete foundation must be poured based on pole height and soil conditions. We provide detailed foundation drawings and anchor bolt cages.

How Long Does Hot-Dip Galvanizing Protect a High Mast Pole?

There is no single anti-corrosion lifespan for every galvanized high mast pole. The coating, site exposure and maintenance criterion must be specified together.

Can high mast poles be shipped in sections?

Yes. Due to height limits, poles over 20m are typically split into 2-3 telescopic sections for convenient shipping in 40ft containers.

Do telescopic poles require welding during installation?

No. Sections are joined via overlap (telescopic fit) using gravity or hydraulic force. This mechanical joint is more flexible and fatigue-resistant than welding.

Do you provide Dialux lighting simulations?

Yes. Our professional lighting design team provides free Dialux simulation reports based on your site’s CAD drawings to optimize lighting layouts.

Do you have project references for airports or seaports?

Yes, we have extensive project references in the Middle East, Southeast Asia, and South Africa. We can provide photos and technical parameters upon request.

What is the warranty period for high mast lighting?

Warranty terms for a high mast project must be confirmed in the written quotation or contract for the exact pole, luminaires, controls and lifting components; no single period applies to every assembly.

Can high mast poles integrate surveillance systems?

Yes. Our light rings can be customized with brackets to accommodate CCTV cameras or other security sensing devices.

What is the EPA (Effective Projected Area) of a high mast?

EPA refers to the Effective Projected Area of the pole and fixtures under wind pressure. It is a critical parameter for calculating structural safety.

Can high mast lights be solar-powered?

Technically yes, but due to high power consumption, very large solar arrays and battery banks are required. We typically recommend grid-tied or hybrid systems.

How do you prevent the internal wire ropes from rusting?

We use high-quality stainless steel or plastic-coated wire ropes and recommend regular greasing during annual inspections.

Do your LED floodlights support 0-10V or DALI dimming?

Yes. With intelligent control systems, you can remotely adjust brightness and scheduling to maximize energy savings.

Contact Us

Get a custom lighting solution and quotation for your project.
Jieyao Lighting Yangzhou Jieyao Lighting Equipment Co., Ltd. manufactures outdoor lighting and steel poles in Guoji Town Industrial Park, Gaoyou City, Yangzhou, Jiangsu, China. The company reports a 10,000 m² factory site, more than 60 employees including more than 10 technical personnel, and more than 100 production and testing machines. The present company name dates from 2017; Jieyao Poles’ published history traces the team’s manufacturing lineage to 2006. The stated 15 years of experience refers to the team. The company reports exports to more than 60 countries.

Do you have any questions or requests?

Email: jay@jieyaolighting.com
Tel: +86 13815843784
WhatsApp: +86 13815843784
Contact
Copyright © 2026 Yangzhou Jieyao Lighting Equipment Co., Ltd. All rights reserved
×
Send Your Inquiry Today
We use cookie to improve your online experience. By continuing to browse this website, you agree to our use of cookie.

Cookies

WhatsApp avatar

Click to Chat.

Im online now.

Hey, I'm Xu Jie from Jieyao Lighting. What can I do for you? Welcome to contact me, WhatsApp: +86 13815843784

WhatsApp Us

WhatsApp us