- Product details
-
JIEYAO LIGHTING · STEEL MASTS AND COORDINATED LED EQUIPMENT
LED High Mast Lighting Poles and Equipment Packages
Steel masts, pictured lighting-head choices and a defined fixed or lowering equipment package.
Jieyao supplies project-configured steel high masts and coordinates the lighting heads, mounting hardware and named electrical or lowering equipment required for the order. Start with a steel mast and headframe, or request a coordinated package with luminaires and the specified accessories.
For yards, terminals, public spaces and road interchanges, the useful choice is the complete arrangement: where the lights point, how they are maintained, what the steelwork carries and which parts arrive together.
SupplySteelwork or a defined equipment packageHead layoutRadial, opposed or directionalServiceLowering or planned fixed-head access
Circular carrier reference. The exact head and equipment schedule are defined for each order.01 / CHOOSE THE LIGHTING HEAD
Three head arrangements, with different aiming priorities
Choose the head layout for your target area, then select fixed or lowering maintenance access and the items included in the offer. These photographs show the mounting forms available for configuration discussions; the accepted drawing identifies the supplied assembly.
Radial circular carrier
Radial bracket positions around a central mast.A starting point where useful lighting directions extend around the mast. Individual brackets let the lighting layout assign different targets to different heads rather than treating the ring as one uniformly aimed source.
Best fit: open yard or junction layouts with target areas on several sides.
Choose with: the head diameter, bracket positions, actual fixture geometry and required aiming clearance. Confirm separately whether the carrier is fixed or lowers.
Opposed floodlight rack
Opposed mounting faces on a compact headframe.Places luminaires on different faces of a rack, useful when the mast sits between two target areas. The two sides can be assigned different optics or aiming angles if the lighting design calls for them.
Best fit: layouts with separated work zones, routes or areas on either side of a mast position.
Choose with: clearance behind each fixture, bracket access, wiring routes and the loads from every fitted head. Symmetrical appearance does not require identical electrical circuits.
Directional crossarm head
Physical crossarm head with several yoke-mounted fixtures.Concentrates mounting positions along crossarms. It is a useful starting form when the permitted mast location is beside the area rather than near its centre, and the beam directions need a defined relationship to the site edge.
Best fit: yard boundaries, stands and working areas reached from an edge position.
Choose with: the target plan, spill-light constraints, individual aiming range and the maintenance route. The final direction of each lamp follows the calculation and aiming schedule.
What the pictures help you choose: mounting form and access space. The final drawing identifies the actual lamp count, supported mass, exposed area and connection details; these are not measured from a photograph.For a closer comparison of maintenance arrangements and head layouts, see the visual high mast selection guide.
02 / MAINTENANCE ARRANGEMENT
Choose access before fixing the head design
Lamp replacement is only one service task. Drivers, connectors, brackets and aiming adjustments also need a workable access plan.
Lowering lamp carriage
Lamp-carriage construction reference. Confirm its travel, suspension and retention arrangement in the selected system documents.The carriage brings the supported lighting equipment to an agreed service position around the mast. This can make sense where routine access by a high-level vehicle is difficult or disruptive, provided there is space below for the carriage and maintenance activity.
The package needs matching winding equipment, ropes, guides, support or retention hardware, cables and controls. Identify which equipment moves and how it is supported in its working position. The selected mechanism’s instructions govern operation and maintenance.
- Keep the service area clear of barriers, parked equipment and stored goods.
- Coordinate fixture clearance, cable movement and carriage travel.
- Define the moving assembly and rated system together.
Fixed lighting head
Crossarm appearance reference. Access provisions are a separate design item.A fixed head keeps the lighting support in its operating position. It can be a practical choice where a suitable access vehicle and a planned maintenance route are available, or where the project specifies a fixed service arrangement.
Compare the equipment cost with the continuing need for access, work windows and traffic management. A fixed head does not automatically include a ladder or platform; those features need their own defined design and supply scope.
- Reserve an access-vehicle position and a suitable route to it.
- Check working reach against the actual lamps and brackets.
- Plan isolation, maintenance and re-aiming around site operations.
03 / A REAL CONFIGURATION TO START FROM
A documented 25 m lowering-mast example
A Jieyao project record for Yancheng describes the following steel mast and lighting arrangement. It provides a concrete starting point for discussing a package, rather than a universal specification for every 25 m mast.
Fabrication photograph included in the Yancheng project record.25 mRecorded mast height12 × 400 WRecorded light-source schedule3 sectionsSlip-joint shaft arrangement6 / 6 / 6 mmRecorded section wall thicknessesThe recorded source-power total is 4,800 W from 12 × 400 W. That arithmetic is not a measured complete-system input or a lighting-performance result.
The project record identifies Jieyao as the supplier and describes cutting, forming, welding and flange fabrication. It does not provide the dimensions, foundation design or measured illuminance needed to transfer this configuration directly to another site.
For a new order, the mast, head, fixture schedule and foundation interface are developed around that project’s loads and lighting layout. A higher mast, more lamps or a different bracket can change several parts of the package at once.
Specification Recorded example What defines your supplied package Mast and maintenance 25 m lowering mast Specified height, operating arrangement and service position on the approved assembly drawing. Shaft arrangement Three slip-jointed sections Section sizes, overlap, jointing instructions, transport lengths and erection sequence. Section wall thickness 6 mm / 6 mm / 6 mm Steel grade and section thicknesses tied to the structural design; not copied from mast height alone. Lighting schedule 12 sources rated 400 W each Identified fixture models, optics, actual inputs, bracket interfaces and aiming schedule. Base connection Flange-connected mast described Base plate, bolt pattern, anchorage and the corresponding foundation interface. Project performance No measured lighting results supplied in this record Project lighting calculation and any agreed site verification using the selected equipment. Download the 25 m configuration reference sheet for the recorded mast and light-source schedule. It is a configuration summary, not a structural calculation or measured lighting report.
04 / CONSTRUCTION DETAILS
The interfaces that make the package fit together
Installed base-interface reference. This photograph is not the Yancheng foundation design.Base flange, anchors and cable entry
The base connection transfers the supported assembly into the foundation. Bolt layout, plate geometry, stiffening and cable entry must agree with the civil interface drawing before the foundation work is committed.
For an existing foundation, send the actual bolt survey and condition information. Similar-looking bolt circles do not establish a compatible replacement. For a new foundation, the site designer needs the agreed mast reactions and local ground information.
Section joints and erection marks
A sectioned shaft makes transport and handling manageable, but it creates an assembly interface that must be preserved. Identify section order, orientation, joint arrangement and any required overlap or fit instructions on the supplied drawing.
Use the order’s lifting and assembly procedure. Packed length, individual section mass and lifting points matter to the site plan just as much as the final mast height.
Coordinate the civil interface using the high mast foundation and anchor-bolt design inputs; the actual soil and approved mast reactions remain project inputs.
Carrier brackets and aiming clearance
The carrier connects the floodlight yokes to the mast assembly. Check the actual fixing pattern, adjustment space and access to fasteners. A lamp that fits the bolt holes may still be obstructed when tilted or when its rear cover needs to open.
Aiming schedules should identify lamp positions so installers can reproduce the intended directions. Distinguish an aiming adjustment from a change to the steel support or to the approved equipment loading.
Winch, drive and controls
For lowering equipment, coordinate the winding unit with the moving carriage and the complete rope and retention arrangement. Specify the supplied manufacturer and model, operating accessories and electrical interface.
The component rating and its operating conditions remain separate from motor power. A higher-powered drive is not an approval to add more lamps to an existing carriage.
Explore winch and drive components →For carrier-only enquiries, review the luminaire mounting rings and steel headframes with the existing mast and fixture interfaces.
Physical winch reference. The supplied system identifies the selected model and rating.05 / LIGHTING CONFIGURATION
Choose the useful light distribution, then finalize the equipment
Lamp wattage and quantity describe part of a package. They do not explain where the light lands, how evenly it reaches the work area or what people see from surrounding routes.
Optics and mounting
Match each fixture’s photometric file to the proposed optic and operating configuration. Use the actual mounting height, tilt and position in the calculation, including buildings, equipment or stored material that affect the target area.
Several lower-output heads with suitable optics may distribute light differently from a smaller number of higher-output heads. Compare calculated results and the associated steelwork and electrical scope.
Colour, controls and operating stages
State required colour temperature and colour-rendering criteria where they matter to the task. Identify the controls to be supplied, their interface and the nightly operating stages.
Separate switching groups can follow different working zones. Dimming needs a compatible driver and control arrangement; it should be named in the offer rather than assumed from an LED label.
Glare and neighbouring areas
Review sightlines for drivers, workers and nearby properties alongside the useful target surfaces. Pole position, optics and aiming are considered together; a shield is an equipment choice, not a substitute for the lighting layout.
For sports or camera-sensitive tasks, state the actual event and image-capture requirements. Agree the applicable criteria rather than attach a broadcast or competition claim to lamp power.
Useful quotation input: send the site plan, intended tasks and acceptance criteria. If a tender specifies values, include the document and applicable version so the calculation and offered equipment answer the same requirement.After the equipment and layout are selected, the floodlight aiming and glare commissioning checklist explains the handover information needed to reproduce the planned directions.
06 / APPLICATION-LED SELECTION
What changes from one site to another?
Application reference: terminal layout with parking rows, vehicle routes and working areas.Logistics and industrial yards
Application reference, not a named Jieyao project.Start with vehicle routes, loading positions, stock areas and pedestrian interfaces. A mast position that is convenient for foundations may be screened by trailers or changing stock heights.
Compare edge-mounted directional heads with centrally placed radial heads against those obstructions. Keep lowering space or access-vehicle routes available after the site is in use, not just during construction.
Ports and open terminals
Application context for exposed terminals.Equipment movement and restricted working zones can dictate mast positions. Include cranes, ship-side activity and changing storage patterns in the lighting brief.
Exposure, cleaning access and maintenance windows influence coating and equipment selection. The corrosion-protection schedule should describe the actual environment and system; coastal location alone does not define a service-life guarantee.
Airport stands and service areas
Airport application reference.Permitted mast positions and spatial restrictions come first. Coordinate the head with stand geometry, aircraft movement and ground-service access, then review aiming and maintenance windows.
A general high-mast package is not an aviation approval. Use the airport’s project criteria and responsible design review for the proposed equipment and location.
Airport apron mast packages →Public squares, parking and road interchanges
Account for the way people and vehicles approach the site, the location of adjacent homes and the available maintenance access. A centrally located mast can distribute light in several directions, but the calculation still needs to distinguish parking bays, traffic lanes, crossings and landscaped areas.
Sports grounds and multi-use venues
Identify the playing or activity surfaces, viewing positions and any camera requirements. A high mounting position is one design variable; required illuminance, uniformity, glare and image quality must be checked for the actual venue and use. Do not select a package solely because a similar-looking head appears at another ground.
07 / FINISH AND ENVIRONMENT
Specify the coating system, not just the colour
Galvanized steelwork
State the galvanizing and inspection requirements in the steelwork specification. Include relevant hollow-section details, accessible surfaces and the treatment of joints and fittings so the coating process is coordinated with fabrication.
The appearance of zinc coating in a photograph does not determine its thickness or a corrosion category.
Additional paint or powder finish
Where a coloured finish is required, define the surface preparation, coating system and colour reference together. Agree which parts receive that system and how mating surfaces, fasteners and identification marks are handled.
A powder finish, marine paint or fluorocarbon system is not an interchangeable label. If one is specified, confirm that exact system and its documentation in the order.
Transport and site touch-up
Protection continues through packing and erection. Specify separation at contact points, protection for flange faces and brackets, and the accepted handling and repair procedure for any damage.
Site repairs should follow the selected coating specification. Uncontrolled overpainting can hide a damaged interface without resolving it.
08 / FROM DRAWING TO FABRICATION
Production follows the agreed mast assembly
Steelwork fabrication photograph from the documented project.Release the interfaces before cutting steel
The mast drawing should identify section arrangement, head connection, access openings and the base interface. The equipment schedule gives the lighting and maintenance hardware that the steelwork must accommodate. Resolving these together reduces the risk of a bracket, cable route or door conflicting with another part.
Form, weld and connect
Jieyao’s project record describes mast cutting, forming, welding and flange processing. For the actual order, the agreed design and inspection plan define the steel material, section geometry and weld requirements. Record checks against component marks so the delivered steelwork can be reconciled with the order drawing.
Finish with the assembly in mind
Coating, identification and any required fit checks need to preserve the designed connections. Keep component marks legible and coordinate what is assembled before dispatch with what must be joined on site.
09 / INSPECTION AND DOCUMENTS
Check the steelwork, mechanism and lights as distinct parts
Steelwork and fit
Base-interface reference for the steelwork check schedule.Agree checks for section identity and dimensions, joints, flange and bolt-hole arrangement, access openings, head interfaces and finish. Any specified weld examination or coating measurement should have an agreed method and acceptance basis.
Ask for: the order drawing, component marks and the inspection records required by the purchase specification.
Lowering equipment
Mechanism-inspection reference; no rated-load result is inferred.Confirm the selected mechanism, included accessories and its compatibility with the moving assembly. Define any fit or function check and the equipment and conditions used to perform it.
Ask for: model identity, interface information and the selected manufacturer’s installation, operating and maintenance documents.
Lighting and controls
Photometric measurement setup. Product data must match the selected fixture.Match reports and photometric data to the actual fixture and optic. Keep electrical checks, control-stage verification and the lighting calculation separate from steelwork acceptance.
Ask for: the exact fixture schedule, applicable product documents and the agreed control description.
The quotation should name which records and checks are included. A company qualification, a component report and an installed-system acceptance record answer different questions.
10 / PACKING, DELIVERY AND SITE HANDOVER
Make every section and loose part identifiable
A package the receiving team can reconcile
Organize the packing list around the actual assembly: mast sections, head members, brackets, fixtures, mechanism, controls and loose hardware where supplied. Identify shared accessories and parts packed separately so the receiving team does not assume a missing carton belongs to another mast.
Agree packed lengths, individual weights, lifting and unloading arrangements from the released design. Protect exposed connections, coating contact points, fixture faces and cable ends. The loading plan needs to reflect the final pieces, not only the mast’s nominal height.
Documents that travel with the order
Include the approved assembly and interface drawings, parts list, equipment identities and the relevant installation and maintenance instructions. The site team should be able to match a marked section or accessory to the same revision used for procurement.
Delivery destination, shipping terms, unloading, civil works, electrical connection and commissioning should each have a clear responsible party. Agree project lead time after the scope and released configuration are established.
Pole-component loading reference. Packing and transport arrangements are defined for the order.11 / WHAT TO INCLUDE IN THE OFFER
Compare like-for-like supply packages
Steel mast and headframe
Mast sections, specified headframe and named steel fittings. List anchor hardware and templates separately if required. A steelwork quotation should not be read as including fixtures, lowering gear or controls unless they are listed.
Useful when: the buyer has nominated lighting or maintenance equipment and needs coordinated steelwork interfaces.
Mast with lighting equipment
The identified steel assembly plus the selected luminaires and named electrical accessories. State whether drivers, control devices, internal cabling and external distribution equipment are included.
Useful when: the light calculation and fixture schedule need to arrive with the supporting assembly.
Mast with lowering equipment
The defined moving carriage, matching mechanism and listed ropes, guides, retention hardware, cables and operating accessories, together with the named steelwork and lighting scope.
Useful when: the maintenance plan depends on lowering the lighting assembly. Site works and commissioning remain explicit offer items.
For the broader design sequence and responsibilities, use the high mast system design and RFQ guide. This product page identifies the head, maintenance and equipment choices to be named in the supply offer.
12 / ORDER DEVELOPMENT
Move from a site brief to an identifiable package
- Share the site and task. Establish target areas, permitted mast positions and maintenance access.
- Compare the supply arrangements. Select the pictured head form, service method and equipment scope.
- Coordinate the interfaces. Resolve the steel assembly, fixture mounting and civil/electrical connection information.
- Release one agreed revision. Tie fabrication, checks and packing to the accepted assembly and equipment schedule.
- Receive against the supplied documents. Reconcile marked parts and complete the agreed site commissioning.
13 / FREQUENTLY ASKED QUESTIONS
Questions that affect the order
Can you quote from our existing mast drawing?
Send the drawing and revision, equipment schedule and required quantity. Identify which parts remain fixed and which may change. If the lamps, head or maintenance arrangement are revised, review the affected steelwork and interfaces before treating the drawing as ready for manufacture.
Can the same mast carry more floodlights later?
Additional lamps change mass, exposed area, electrical demand and possibly the moving load. Spare bracket space is not an approved reserve capacity. Have the actual mast, head and maintenance arrangement reviewed for the proposed additions.
Does a taller mast always need fewer lighting positions?
No. Height changes distribution, aiming and structural requirements, but the result also depends on the site geometry, optics and lighting criteria. Compare complete layouts rather than replacing several positions with one taller mast by assumption.
Can you supply only the ring or winch?
A component enquiry is possible, but it needs the mating equipment identity and interfaces. State whether you need steel carrier parts, a winding unit, a drive or a complete matched package. Physical similarity is not sufficient evidence of compatibility.
Are the application photographs completed Jieyao projects?
The application photographs illustrate site and equipment arrangements. The Yancheng configuration is separately identified from a supplied company project record; the other reference scenes are not presented as named Jieyao deliveries.
What determines the final price and delivery schedule?
The released steelwork, lighting and mechanism scope, quantities, finish, documentation, packing and destination all affect the offer. Quoting against one agreed schedule makes it possible to compare suppliers without omitting components or site responsibilities.
LET’S DEFINE YOUR PACKAGE
Send the layout. Tell us how the mast will be maintained.
We can organize the enquiry around the steel mast, head arrangement and the equipment you want included. A clear preliminary brief is enough to start; label any dimensions or equipment choices that are still provisional.
Discuss your high mast project ↗Include these project inputs
- Location, quantity, site plan and proposed mast positions
- Required height or spatial restrictions
- Lighting criteria, fixture preferences and operating stages
- Fixed or lowering access and available service space
- Steelwork, mechanism, lighting and electrical supply boundary
- Required documents, finish and delivery destination
-
-
