- Product details
-
Define the integration boundary first
A smart pole with EV charging is an integrated product concept, but the phrase does not define a universal electrical package. Before comparing offers, decide which functions are required: lighting, one or more charging points, metering, user authentication, communications, payment interface, monitoring and maintenance access. State whether the charger is pole-mounted, in a separate enclosure or provided as a paired unit.
Electrical compatibility depends on the destination market and the project supply. Confirm the available service, protective devices, earthing, cable route, connector type, charging protocol and any applicable certification or network requirement with the project’s electrical designer. A pole image cannot establish compliance, charging power or interoperability.

Charging socket mounted on a lighting pole
EV charging pole configurations and equipment compartments
Jieyao’s product document describes lighting poles combined with an AC wallbox or an integrated charging module. The steel structure, mounting arrangement and equipment access are coordinated around the selected charger; a pole shell on its own is not a complete certified charging station.
Configuration Product arrangement Detail that defines the assembly External wallbox layout Dedicated mounting face or bracket on the pole Wallbox dimensions, cable exit, socket reach and service access. Integrated module layout Charging equipment placed in a coordinated enclosure Compartment dimensions, ventilation, separation, access door and replacement path. Vehicle connection Single or dual connection direction in the product material Exact charger model, destination connector and simultaneous-load basis must be listed. Lighting equipment Luminaire arm, cable route and service access Separate lighting and charging load schedules and isolation responsibilities. Network and metering Optional communication, authorization and meter integration Compatibility belongs to the named charger/platform version, not to the pole structure. The charging socket, charger-component assembly and engineering-screen images relate to different integration stages. The equipment drawing should distinguish the pole’s structural compartment from electrical equipment, show the usable mounting envelope and preserve removal space. A displayed test screen is not evidence of a particular certified charging power or protocol version.
Reference charging module: GL-CD32 / EV32A manual
The supplied AC charging-module manual identifies GL-CD32 in its technical-parameter table and product image; the cover and naming section also use EV32A. This is equipment-supplier documentation for a reference module, not a separate certified Jieyao complete-pole model. Keep the charger nameplate, manual revision and final integrated assembly linked when ordering.

Reference module image extracted from the supplied product manual. It identifies the charging component; it is not a photograph of a completed pole-and-charger installation.
Product item Documented configuration Input supply AC 220 V, 50 Hz. Maximum output current 32 A; the naming section describes a nominal 7 kW AC product direction. Operating / storage temperature −20 to +50 °C operating; −40 to +70 °C storage, as stated in the manual. Enclosure protection claim IP54 stated by the manual; no separate test report for this module has been verified here. Wired communication CAN and RS485 listed. Optional communications 4G, GPRS, Wi-Fi and Ethernet modules listed as options; not all supplied as standard. Connection variants The naming section distinguishes single- and dual-connector versions; total simultaneous-load capability is not established by the model name alone. Installation condition The manual calls for installation by qualified personnel and an overhead shelter to prevent direct rainfall on outdoor equipment. 
Original module outline from the supplier manual. Small dimensions must be checked against a controlled equipment drawing; no unreadable dimension has been transcribed into this page.
The manual describes emergency stop and protection functions, but this page does not convert those descriptions into independently verified certification. Connector compatibility, destination-market compliance, leakage-protection arrangement, metering and platform protocol require the exact equipment documents. No OCPP compatibility is inferred from CAN/RS485 or a network-module option.
For pole integration, match the module mounting envelope, retaining arrangement, protected cable route, access/removal space, shelter and earthing to a controlled pole drawing. The pole shell, charger module and site electrical installation are distinct verification scopes. No validated drawing of the complete GL-CD32/pole combination has been identified in the archive.
Documented steel-pole manufacturing reference
Jieyao’s enterprise standard Q/321084 JYZM002—2023, issued 23 February 2023 and implemented 24 February 2023, records the following manufacturing reference values. These are documented criteria, not measured results for the product shown on this page. The quotation and approved drawing identify the configuration being supplied.
Item Documented reference Application and limit Shaft material Q235 or material with similar properties; material thickness ≥3 mm Clause 4.6; actual grade and thickness stated on the approved drawing. Shaft section Round, hexagonal, octagonal, twelve- or sixteen-sided tapered forms Clause 3.1; selected geometry depends on the product assembly. Pole and arm reference range Straight sections: 3–12 m; cantilevered poles: 5–12 m; arm outreach: 0.75–3 m Table 1 is a general steel-pole range, not a rating for every specialist configuration. Straightness reference Axis straightness error not greater than 0.3% of pole length Clause 4.3.1; dimensional inspection against the applicable drawing. Zinc-coating criterion At least 65 μm for metal thickness below 5 mm; at least 86 μm at 5 mm and above Clause 4.5.2 of this enterprise standard; measured shipment results are separate records. The steel-pole reference below concerns fabrication of the support only. It does not certify an EV charger, establish electrical protection performance, or confirm OCPP, connector or billing compatibility. Electrical equipment data must be taken from the selected supplier documents.
Pole and charger configuration options
The product materials include single- and dual-outlet directions, pole-mounted and separate charging-unit formats, and several control or access concepts such as RFID, QR access, metering and network communication. Availability and compatibility need to be confirmed for the chosen model and market. Do not combine feature names from separate concepts and present them as one standard product.
The structural review should account for the charger and enclosure mass, cable forces, service access, door swing, connector storage, bollard or vehicle-protection needs and the lighting arm or luminaire. The civil layout should show parking-bay position, vehicle clearance, accessible routes, pedestrian movement and maintenance access.
StructureConfirm the pole geometry, material and connection shown on the project drawing.EquipmentList each luminaire, camera, panel, charger or accessory that adds load or needs service access.SiteMatch the product to the authority, electrical, civil and installation requirements for its location.Product engineering & procurementMechanical layout around the parking bay
Coordinate pole position with the parking-space plan, vehicle doors and charging inlet location, cable reach, pedestrian routes, accessible parking requirements and maintenance access. Show the charger display, connector storage, enclosure doors and lighting arm in the same drawing. If the charger is mounted to the pole, account for its mass and projected area; if it sits in a separate housing, show its foundation and cable interface.
Consider vehicle impact protection, curb location, water drainage, snow or cleaning access, bollards and cable-trip exposure according to local design requirements. These are site decisions rather than universal product dimensions. The civil designer should confirm turning paths and accessible clearances before the pole foundation is fixed.
Product data and procurement table
Use the matrix below to turn an early concept into a reviewable specification. Mark each function as included, optional, supplied by the customer or by the local contractor. Record the exact model and approved drawing before manufacture, then align the charging equipment documents with the pole submittal.

Charger engineering test screen during equipment review
System item Project decision Evidence / interface to confirm Charger format Pole-mounted, paired enclosure or another arrangement Approved model, dimensions, operating and service clearances Charging duty Required power level, outlet count and usage profile Destination-market product data and electrical design Connector and access Connector standard, cable reach and user authorization Local compatibility, RFID/QR or payment requirements Electrical supply Voltage, phase, protection, earthing and feeder route Electrical designer and utility approval Lighting and pole Luminaire, arm, charger and other pole-mounted equipment Combined structural load and approved drawing Software and services Monitoring, metering, network protocol and support model Named provider, service boundary and interoperability proof Civil and safety Foundation, bay layout, vehicle protection and accessible route Site plan, local code and contractor responsibility This schedule is for project coordination. Final dimensions, loads, materials, finishes, standards and supply scope must be stated in the approved drawing and quotation for the selected model.
Product engineering & procurementElectrical service and responsibility schedule
A combined pole does not establish that the existing street-lighting feeder can serve an EV charger. The project electrical designer and utility need to confirm available capacity, voltage and phase, protective devices, earthing, isolation, feeder route and metering. Identify which party supplies the charger, cable, protection, service panel, communications hardware and commissioning. Any product rating or connector statement must match the selected model and destination market documentation.
For networked operation, specify the required communications path, access method, software or service provider, data responsibility and support arrangement. If payment or user authorization is required, name the party responsible for system setup and ongoing service. Avoid describing a charger as “smart” without identifying the functions actually included in the quoted configuration.
Integration, assembly and verification
A combined pole should be reviewed across mechanical, electrical and operational interfaces. The mechanical drawing should locate the luminaire, charger, user interface, cable outlet, access doors and internal routing. The electrical package should identify protective devices, conductor sizing, earthing, service isolation and the control/network path. Responsibility for local grid connection and commissioning should be stated clearly.
For inspection, compare the actual charger label and connection details with the submitted model and destination requirements. Verify mounting, enclosure access, cable strain relief, labels and the approved pole configuration. Any test evidence should identify the specific equipment and applicable scope. Field commissioning is still needed to validate the installed site, supply and communications.
Input review
Receive the controlled layout, equipment data, project specification and foundation interface.Drawing coordination
Resolve the pole geometry, attachment orientation, cable route, access and supply boundary before release.Production and inspection
Check the supplied pole and accessories against the released drawing and agreed inspection list.Product engineering & procurementInstallation, commissioning and service handover
Plan the installation sequence across foundation, pole erection, charger mounting, electrical connection, communications setup, protective equipment and site markings. State which work is performed by the pole supplier and which by the electrical contractor or charging-network provider. Before energizing, the responsible parties should complete the checks and approvals required for the selected charger, supply and destination market.
The handover package should identify the installed charger model, pole drawing revision, electrical and civil interfaces, operating instructions, service contacts and any network enrollment responsibilities. Clarify who maintains the pole finish, luminaire, charger, connector and software service. A mechanical pole quotation alone does not guarantee that the charging point is connected, commissioned or available to users.
Suitable project contexts
Potential contexts include municipal roadside parking, commercial car parks, business parks, campuses, transport facilities and residential visitor parking. These are use settings only. Traffic management, grid capacity, parking policy, accessibility rules, charger network selection and ownership model determine whether a pole-mounted charger is appropriate.
For a retrofit, first check the existing pole condition, foundation, supply cable and spare electrical capacity. A new charger can change the structural load and the demand on the electrical service. Do not assume that an existing lighting circuit can support vehicle charging; the electrical engineer and utility must confirm the supply arrangement.

EV charger component assembly work
Product engineering & procurementSmart charging pole RFQ responsibility matrix
Use the matrix to make inclusions and interfaces explicit before comparing bids. The project team should replace generic entries with the actual model, market requirement and named responsible party.
Ask for a combined layout drawing plus separate technical documents for the pole, luminaire, charger and electrical works. This keeps the integrated concept understandable without suggesting that every component is supplied by one manufacturer.
Work package Project input Responsibility to name Pole and lighting Pole geometry, luminaire, arm, loads and finish Pole supplier / lighting designer EV charger Exact model, connector, rating, access and quantity Charger manufacturer / buyer Electrical works Supply, feeder, protection, earthing, metering and isolation Electrical contractor / utility Parking and civil Bay layout, foundation, accessible route and protection Civil designer / site owner Network services Communications, authorization, billing and service support Named network operator Commissioning Inspection, energization, setup and acceptance records Project commissioning lead Release check: keep project inputs, supplier response and approval owner on the same controlled drawing and document revision.What to include in your RFQ
Share the destination country, site plan, parking-bay arrangement, intended user group, charger quantity, required connector and charging duty, electrical supply data, metering or access method, communications requirement, luminaire details, pole and foundation information, local approvals, quantity, inspection scope and delivery schedule.
Ask the supplier to list exactly what is included: pole, charger, connector cable, protection, user interface, software or network services, signage, foundation, wiring and commissioning. If a local contractor supplies grid connection or civil works, identify the hand-off point. This makes price comparisons more useful and reduces late interface changes.
Before order release
Ask the supplier to list inclusions, exclusions, required approvals, open interfaces, supplied documents and the drawing revision. Compare quotations only after these points refer to the same scope.
Product engineering & procurementHow to compare technical offers without mixing unlike scopes
Compare the pole, lighting equipment, charger, electrical works and network services as separate line items before evaluating a combined price. Check that every offer uses the same charger model or clearly states alternatives, outlet count, connector, electrical assumptions, mounting arrangement, foundation scope and commissioning boundary. A low total can conceal exclusions such as the feeder, protective devices, communications or civil work.
Request a deviations list that identifies assumptions, optional items, excluded approvals, document deliverables, warranty scope and local service responsibilities. Align the quotation with the drawing and destination-market requirements so the buyer can distinguish a pole-only proposal from a complete, commissioned charging point.
Product engineering & procurementOperations and service model after installation
Before procurement, decide who owns the charger, who can use it, how access is granted, how energy is metered or billed, who receives fault alerts and who provides maintenance. These operational choices influence whether the selected model needs a network connection, user interface, payment service or local monitoring. They are separate decisions from the steel pole geometry and should be confirmed with the charger provider and site operator.
Document service contacts and replacement responsibilities for the pole, luminaire, charger and network service. Clarify who can isolate the charger, who may replace a connector or protective component, and how the site returns to service after a fault. Do not promise uptime or network compatibility without model-specific evidence and an identified service agreement.
Production checks and evidence supplied with the order
The steel support is checked for shaft geometry, welds, mounting provisions, access and coating against its released drawing. Charger electrical protection, metering, communication and charging tests belong to the exact charger and destination-market requirements. Where an integrated package is ordered, link the charger serial/model record and its test documents to the pole assembly record rather than treating a generic pole inspection as electrical certification.
Stage Check described by the manufacturing standard Record to match to the delivery Material receipt Check material certificate and thickness Material identity and thickness record linked to the order. Forming and fit-up Measure section geometry, length and mating interfaces Released drawing and dimensional check sheet. Welding Visual examination; sampled ultrasonic or magnetic-particle examination as specified in the standard Weld inspection scope and applicable examination record; not a claim of 100% NDT. Surface protection Non-destructive zinc-thickness measurement and visual finish inspection Coating readings and inspection locations for the supplied batch. Final release Compare pole, accessories and identification against the agreed scope Factory inspection record, conformity document and packing list as agreed. Clauses 5–6 of Q/321084 JYZM002—2023 describe the measurement and inspection methods and require factory quality inspection before release. A written standard establishes the inspection basis; the order-specific records establish what was actually inspected. Confirm the document list in the contract.
Existing corrosion-test evidence: scope of the tested sample
Jieyao holds report A2220577780101001C, dated 10 February 2023, issued by CTI Engineering Testing Co., Ltd., Anhui Branch, for an 11 m street-light pole. Page 3 records a 1,000-hour neutral salt-spray test under GB/T 2423.17-2008, with no red or white rust reported and a pass against the stated client criterion.
This is evidence for the identified test sample. It is not a test of every configuration on this page, does not certify the attached electrical equipment and cannot be converted into years of outdoor service life. For an order, match the material, coating system, specimen and report scope to the offered product.
Frequently asked questions
Does every smart pole with EV charging include networking and payment?
No. Authentication, payment, communication and software services vary by selected charger and market. List each requirement and responsible supplier in the RFQ.
Can the charger be added to an existing street light pole?
Only after structural, electrical, foundation, access and code reviews. Existing lighting circuits should not be assumed to support EV charging.
How do I select the charger rating?
Start with the intended use, dwell time, vehicle compatibility, electrical service and local rules. The electrical designer should specify the required rating and protection.
Who connects the pole to the local grid?
This depends on the project contract. Identify the supplier hand-off point and who handles utility coordination, feeder installation, inspection and commissioning.
Can a lighting pole carry two charging outlets?
The source materials show a dual-outlet direction, but exact model availability, load and compliance must be confirmed for the destination market.
What should be checked in a quotation?
Check charger model, connector, rating, electrical protection, communications, services, pole structure, foundation, installation boundary, documents and commissioning responsibilities.
Project note: product illustrations and application images show configuration or use contexts. They do not identify a named customer installation or establish an approval, certification, load rating or specification. Confirm the selected model, project inputs and applicable documents before order release. -
-