- Product details
-
What makes a breakaway pole a system decision
A breakaway light pole is not made crashworthy by a label on the shaft or by changing one base component. Roadside safety performance depends on the tested or accepted assembly and the conditions under which it is installed. The road authority’s specification should identify the applicable standard, accepted release mechanism, maximum permitted attachment configuration and required records.
That boundary matters when a project adds a longer arm, a heavier luminaire, a sign, a camera or another device. A change in height, mass, mounting position or foundation geometry can change the assembly from the one covered by the original evidence. Treat the base, pole and top-mounted equipment as a coordinated bill of materials, then check any proposed variation against the governing approval.

Slip-base connection configuration for a breakaway light pole
Breakaway assembly configurations and component details
Jieyao’s product material presents slip-base and frangible connection directions, with straight, single-arm and double-arm steel pole layouts. The pole shaft, release connection and electrical interface form one coordinated assembly; a standard flange connection alone is not a breakaway mechanism.
Configuration Product arrangement Detail that defines the assembly Slip-base arrangement Steel shaft and flange interface with a defined slip connection Connection geometry, fastener specification, tightening procedure and foundation level must match the accepted assembly. Frangible connection Pole support with a specified sacrificial or release component Identify the component manufacturer, exact part and applicable test or acceptance evidence. Single or double arm Arm outreach and luminaire positions matched to the pole drawing The complete top mass and projected area belong in the assembly review; accessories are not automatically covered. Electrical disconnect Separate disconnect components at the agreed cable interface Show connector location, cable protection and the electrical installer’s responsibility. The component photographs on this page distinguish the slip-base arrangement, luminaire mass check and electrical disconnect kit. They show which interfaces need coordination; they do not establish collision-test approval. A drawing package should identify the shaft, base connection, arms, fasteners and electrical parts by revision so replacements can be matched to the same assembly.
Release connection: visible parts and assembly identity
The close-up below shows a pole flange supported above the concrete by separate connection components, with the cable passing through the centre. Read it alongside the slip-base view earlier on this page: these are different connection arrangements, not interchangeable base parts.

Component close-up from the supplied product material. Identify the exact release parts, flange, fasteners and cable interface on the ordered assembly drawing; the photograph is not crash-test evidence.
Connection zone Detail visible or specified Required product identity Upper flange Pole flange, stiffeners and upper fasteners Shaft drawing, flange geometry and mating part. Release components Individual components between flange and foundation Exact part number, material and accepted assembly reference. Cable path Cable passes through the central opening Specified disconnect parts and routing detail. Foundation face Concrete level and anchor/release interface As-built level and approved civil connection. Manufacturing reference: Appendix A.6 of Jieyao’s steel-pole standard lists luminaire connection diameters of 48, 60, 76 and 102 mm with different engagement lengths. These describe conventional shaft/arm interfaces only. For a breakaway assembly, use the connection and top load identified by its accepted drawing; a matching tenon diameter does not establish collision performance.
Representative release configuration: documented scope and open evidence
The representative configuration on this page is a steel lighting pole with a slip-base release interface, illustrated by the supplied base-assembly and electrical-disconnect images. It is a configuration description, not a verified catalogue model code. The separate frangible-component close-up represents an alternative connection approach.
Product item Documented configuration Pole package Steel shaft, selected arm and luminaire interface, release-base parts and specified electrical disconnect. Assembly identity Exact shaft, release mechanism and hardware must be named together on the project submittal. No verified complete model identifier is assigned here. Steel fabrication basis Jieyao enterprise standard Q/321084 JYZM002—2023 provides a manufacturing reference for conventional steel-pole work. Evidence available for this page Component photographs and product configuration material; these establish the illustrated interfaces only. Evidence not established No exact-assembly crash-test report, authority acceptance or approved top-load envelope has been verified for this configuration. For a request, specify the authority’s required test/acceptance basis and the full pole, luminaire and accessory arrangement. The quotation should identify the offered assembly and what evidence actually covers it. A general company certificate or conventional pole test cannot be represented as approval of its release behaviour.
Configuration options to review
Project materials describe release-base directions such as slip-base and frangible connections, with single-arm, double-arm, straight-shaft and curved-arm pole configurations. These are selection directions, not a statement that every combination is interchangeable or approved. The permitted combination depends on the applicable report, authority specification and the actual top load.
Start with the required function and the report boundary. Record the pole material and geometry, base type, luminaire arrangement, total attachment mass and electrical disconnect method. If a project permits a small sign or other accessory, list it explicitly with its dimensions and mounting position. Do not add an accessory after approval without a documented review.
StructureConfirm the pole geometry, material and connection shown on the project drawing.EquipmentList each luminaire, camera, panel, charger or accessory that adds load or needs service access.SiteMatch the product to the authority, electrical, civil and installation requirements for its location.Product engineering & procurementPole geometry and equipment data that drive the review
The shaft and arm drawing should state the proposed height, section profile, arm outreach and direction, connection detail, base interface and cable access. The lighting schedule should identify the exact luminaire model, mass, projected area and mounting position. Add signs, cameras, brackets, banners or other accessories to the same schedule, including dimensions and position. These inputs allow the structural reviewer to compare the proposed top load and geometry with the road project’s design basis rather than infer them from a product photograph.
For roadside use, site location matters as much as the pole description. Record the road class or facility, posted or design speed where relevant, shoulder and barrier arrangement, clear-zone decision, terrain exposure and installation orientation. These are project inputs for the engineer or authority; this page does not assign a universal pole size or claim that one breakaway configuration is suitable for every road.
Product and interface schedule
A useful breakaway pole schedule does more than state pole height. It identifies the mechanical release interface and the equipment fitted above it so that design, procurement and installation refer to the same configuration. The table below is a submittal checklist; project values should come from the authority’s documents and the approved calculation or test record.

Luminaire mass being checked as part of a pole assembly review
Assembly item Information to specify Verification point Pole shaft and arm Material, geometry, height, outreach and luminaire orientation Match the authority-approved assembly and drawing Release base Slip-base or frangible connection direction; orientation and hardware Confirm exact base, parts, grade and permitted assembly Top-mounted equipment Luminaire, bracket, sign or other attachment, including mass and area Compare with the evidence and top-load limits Electrical interface Cable route, connector or disconnect arrangement Confirm the approved electrical detail and safe isolation method Foundation interface Anchor layout, projection, concrete interface and finished level Use project drawings; do not substitute a standard base without review Evidence package Applicable report, standard, drawing revision and inspection records Check issuer, model, scope, configuration and validity This schedule is for project coordination. Final dimensions, loads, materials, finishes, standards and supply scope must be stated in the approved drawing and quotation for the selected model.
Product engineering & procurementEvidence review: match the report to the offered parts
A test report, evaluation letter or certificate is useful only when its issuer, model identity, configuration, referenced standard, scope and validity can be matched to the quoted assembly. Compare the base type and hardware, shaft geometry, arm arrangement, luminaire and accessory schedule, electrical disconnect and installation orientation. If the document covers a family of options, check the stated limits and permitted combinations instead of assuming every variation is included.
Keep the evidence review separate from the pole quotation and from the authority’s acceptance. The purchaser should name which documents are required and who will approve them. If evidence for the exact model is not available in the supplied package, identify that as an open item before order release; do not substitute a general company certificate or a different model’s report for assembly-specific approval.
Manufacturing and inspection coordination
Before fabrication, freeze the released drawing and identify the exact parts included in the tested or accepted assembly. Keep revision control across the shaft, arm, base, anchor interface and electrical components. This prevents a quotation, fabrication drawing and test file from silently describing different combinations.
At inspection, verify the observable items tied to that drawing: pole geometry, base orientation, connection parts, hole pattern, attachment position, labels and supplied hardware. Where the project calls for test reports or certificates, check the issuer, model identifiers, configuration, standard and scope. A document should not be treated as proof for a different pole, base or attachment combination.
Input review
Receive the controlled layout, equipment data, project specification and foundation interface.Drawing coordination
Resolve the pole geometry, attachment orientation, cable route, access and supply boundary before release.Production and inspection
Check the supplied pole and accessories against the released drawing and agreed inspection list.Product engineering & procurementInstallation planning and as-installed verification
The installation method should follow the approved project documents and road-authority instructions. Coordinate traffic control, lifting access, foundation readiness, anchor projection, orientation, electrical isolation and the sequence for assembling the release interface. Confirm that the crew has the specified hardware and understands which components must not be modified, painted over or substituted in the field. Installation planning is especially important where the assembly is located near a live carriageway or other controlled work zone.
At handover, record the installed pole and base identifiers, attachment schedule, orientation and drawing revision if the project requires an as-built record. The installer should report any field deviation for engineering review before energizing or accepting the pole. A correct product selection cannot compensate for an unreviewed foundation, incorrect orientation or a component substitution during installation.
Where roadside breakaway supports may be considered
Typical review locations include highway shoulders, urban expressway edges, interchange approaches, bridge approaches and other roadside positions where the road authority manages a clear zone. These are application contexts, not proof that a breakaway support is required at every such site. Barrier placement, road geometry, speed environment, pedestrian exposure and local rules all affect the decision.
The project engineer or authority should make the site decision. For existing poles, first identify whether the issue is a safety upgrade, replacement after impact or a new installation. A retrofit base must be checked with the existing shaft, luminaire and foundation rather than assumed to preserve an assembly’s qualification.

Steel pole manufacturing work for a roadway support
Product engineering & procurementInspection and documentation checklist
Define inspection points against the approved drawing and purchase specification. Depending on the agreed scope, the review may cover shaft dimensions, arm and base orientation, connection parts, hole pattern, supplied hardware, weld and finish requirements, component markings and packaging by pole number. State acceptance criteria and any inspection or witnessing requirement before production; do not assume a test or inspection is included unless it appears in the quotation.
The document package can be organized by assembly: released drawing, bill of materials, applicable evidence, material or finish records when ordered, inspection record, installation instructions and packing list. Check document identifiers against the actual product. A report should not be applied to a different model, and a generic quality-system certificate should not be represented as proof of crash performance.
Information to send for a quotation
A clear RFQ lets the supplier check scope before price comparison. Send the project location and governing specification; pole layout and foundation drawing; pole height and arm arrangement; luminaire make, model, mass and wind area; accessory schedule; cable and disconnect requirements; finish; quantity; inspection and document list; and delivery destination.
If some inputs are not final, label them as preliminary and identify who will approve them. The supplier can then distinguish confirmed items from open interfaces and avoid presenting an incomplete combination as a finished compliant assembly. Before order release, align the quotation, approved drawing, equipment schedule and evidence documents.
Before order release
Ask the supplier to list inclusions, exclusions, required approvals, open interfaces, supplied documents and the drawing revision. Compare quotations only after these points refer to the same scope.
Product engineering & procurementNew installation, replacement and retrofit are different scopes
A new roadside installation starts with the project’s accepted safety strategy and civil design. A replacement after impact adds questions about the existing foundation, anchor condition, damaged components, traffic management and whether the replacement must match a previously approved assembly. A retrofit that changes only the base still requires a compatibility review of the shaft, top load, foundation and release hardware.
The RFQ should state which situation applies and identify any existing pole or foundation drawings. Include photographs only as supporting context; dimensions and approval records should come from controlled project documents. This distinction helps the supplier quote the correct scope and prevents a replacement part from being mistaken for a complete, approved roadside-safety assembly.
Product engineering & procurementBreakaway pole RFQ handoff matrix
Use the matrix to close the main design and procurement interfaces before comparing offers. It is intentionally a data-request tool: project values, acceptance criteria and any required approval must come from the road authority, engineer and model-specific documents.
Ask each bidder to identify included parts, exclusions, open assumptions, evidence supplied for the named configuration, drawing revision, inspection scope and installation responsibilities. This makes technically different assemblies visible during evaluation instead of after order placement.
Decision area Project information to provide Supplier response to request Roadside basis Authority specification, site role and accepted evaluation basis Named assembly and evidence references; unresolved approvals Pole and top load Height, shaft, arms, luminaire and all attachments Configuration drawing and identified load schedule Release interface Required base approach, orientation and hardware Exact parts and assembly / installation instructions Civil and electrical Foundation, anchors, cable route, disconnect and grounding Interface drawing and stated supply boundary Inspection and handover Acceptance points, records and witness requirements Itemized documents, inspection scope and revision control Release check: keep project inputs, supplier response and approval owner on the same controlled drawing and document revision.Production checks and evidence supplied with the order
For the steel shaft, manufacturing checks cover section geometry, wall thickness, weld appearance, flange alignment, access opening and coating. For the release assembly, a separate controlled checklist should cover the specified parts, mating surfaces, fasteners and assembly instructions. Do not substitute a bolt, base component or luminaire solely because it fits mechanically.
Stage Check described by the manufacturing standard Record to match to the delivery Material receipt Check material certificate and thickness Material identity and thickness record linked to the order. Forming and fit-up Measure section geometry, length and mating interfaces Released drawing and dimensional check sheet. Welding Visual examination; sampled ultrasonic or magnetic-particle examination as specified in the standard Weld inspection scope and applicable examination record; not a claim of 100% NDT. Surface protection Non-destructive zinc-thickness measurement and visual finish inspection Coating readings and inspection locations for the supplied batch. Final release Compare pole, accessories and identification against the agreed scope Factory inspection record, conformity document and packing list as agreed. Clauses 5–6 of Q/321084 JYZM002—2023 describe the measurement and inspection methods and require factory quality inspection before release. A written standard establishes the inspection basis; the order-specific records establish what was actually inspected. Confirm the document list in the contract.
Frequently asked questions
Does a breakaway base make any light pole crashworthy?
No. The complete assembly and installation must fit the applicable approval or test evidence. A base cannot be evaluated in isolation from the pole, attachments and foundation conditions.
Can I add a sign or camera to a qualified breakaway pole?
Only after checking the added mass, projected area, mounting position and exact assembly against the governing report and authority requirements.
Can an existing pole be converted by replacing its base?
Do not assume so. The shaft, hardware, luminaire, foundation and release behavior need a documented engineering and authority review.
What documents should accompany the quotation?
Provide the applicable standard and authority specification. Ask the supplier to identify the offered assembly, drawing revision and any test or certification evidence that applies to that exact configuration.
Are slip-base and frangible-base designs interchangeable?
No. They are different release approaches. The project specification and accepted evidence determine the required design and installation details.
What is the most important input for pole selection?
The governing requirement and the full equipment schedule are essential. Pole height alone is not enough to identify an acceptable assembly.
Project note: product illustrations and application images show configuration or use contexts. They do not identify a named customer installation or establish an approval, certification, load rating or specification. Confirm the selected model, project inputs and applicable documents before order release. -
Project data to confirm before ordering
There is no single universal breakaway-pole schedule. Provide values from the project drawings and the applicable road-authority documents so the quotation and supplied configuration can be reviewed consistently.
Parameter Required project input Overall height and shaft section Approved pole elevation and section details Arm outreach and orientation Lighting layout and luminaire mounting drawing Base and anchor interface Release-base drawing, anchor plan and foundation details Top load and projected area Complete equipment schedule including attachments Design environment Site location, governing criteria and applicable design inputs Finish and inspection Project finish schedule, inspection points and required records Values and acceptance documents are configuration-specific. Do not apply a report, rating or approval to a changed assembly without the responsible authority’s review.
-
Configuration and specification basis
Breakaway pole assemblies must be defined against the project drawing and governing roadside-safety criteria. The listed interfaces are review points; fixed dimensions and crash-performance claims must be confirmed for the exact offered configuration.
Item Specification basis Pole geometry Set by the approved elevation and fabrication drawing. Release interface Identify the exact base mechanism, parts, orientation and supporting approval or test documentation. Top-mounted equipment Schedule the luminaire, arm and every attachment by model, mass and position. Foundation connection Coordinate the anchor and concrete interface with the project civil drawing. Electrical details Show cable routing, disconnect and grounding requirements in the approved electrical documents. Evidence package Match report or certificate scope, model identity and revision to the exact supplied assembly.